This appendix ties the GHRM to the ICE Manual of Geotechnical Engineering (Institution of Civil Engineers), the two-volume general reference on geotechnical practice. It lists the bibliographic details, maps every ICE chapter to the GHRM chapters that cover the same subject and back again, and records the gap-fill chapters written from the comparison.
The ICE Manual of Geotechnical Engineering is a two-volume reference published by the Institution of Civil Engineers. Volume I covers geotechnical principles, problematic soils and site investigation; Volume II covers the design of foundations, retaining structures, earthworks, slopes and pavements, construction processes and construction verification. It is written for practice in the United Kingdom and uses Eurocode terminology and SI units, but most of its content applies directly to North American railroad work.
This manual does not reproduce the ICE Manual. Its text, figures and tables are copyright of the publisher and are not copied here. Instead, every GHRM chapter carries a Further reading box listing the ICE chapters that cover the same subject, and the tables in this appendix map the two books to each other in both directions. Where the ICE Manual covers a subject the GHRM did not, new GHRM chapters have been written in original wording, in English units and for railroad conditions (Section G.4).
Readers who hold a licensed copy can go straight from a GHRM chapter to the matching ICE chapter. The ICE Manual is also available through the ICE Virtual Library and many engineering libraries.
Burland, J., Chapman, T., Skinner, H. and Brown, M. (eds) (2012). ICE Manual of Geotechnical Engineering, Vol. I: Geotechnical Engineering Principles, Problematic Soils and Site Investigation; Vol. II: Geotechnical Design, Construction and Verification. ICE Publishing, London.
Brown, M., Burland, J., Chapman, T., Higgins, K., Skinner, H. and Toll, D. (eds) (2023). ICE Manual of Geotechnical Engineering, 2nd edition, Vols I and II. Emerald Publishing, Bingley, on behalf of ICE Publishing.
Chapter numbers in this appendix follow the published contents of the manual: 101 chapters in nine sections, Chapters 1 to 50 in Volume I and 51 to 101 in Volume II. The chapter titles are given in full so that the right chapter can be found in either edition; if a chapter number in your copy differs, use the title.
Each ICE chapter is listed with the GHRM chapters that cover the same subject, the most relevant first. Chapters marked new were written to fill a gap found during this comparison.
| ICE Ch. | ICE chapter title | GHRM chapters |
|---|---|---|
| 1 | Introduction to Section 1 | Ch. 1.0 |
| 2 | Foundations and other geotechnical elements in context: their role | Ch. 1.0 |
| 3 | A brief history of the development of geotechnical engineering | Ch. 1.0 |
| 4 | The geotechnical triangle | Ch. 1.0, Ch. 3.9 |
| 5 | Structural and geotechnical modelling | Ch. 6.1, Ch. 6.2 |
| 6 | Computer analysis principles in geotechnical engineering | Ch. 6.3, Ch. 6.2 |
| 7 | Geotechnical risks and their context for the whole project | Ch. 1.1, Ch. 3.8, Ch. 3.8 |
| 8 | Health and safety in geotechnical engineering | Ch. 3.9, Ch. 4.1, Ch. 3.10 new, Ch. 5.4 new |
| 9 | Foundation design decisions | Ch. 6.1, Ch. 7.1 |
| 10 | Codes and standards and their relevance | Ch. 1.0 |
| 11 | Sustainable geotechnics | Ch. 1.0, Ch. 7.2 |
| ICE Ch. | ICE chapter title | GHRM chapters |
|---|---|---|
| 12 | Introduction to Section 2 | Ch. 2.1 |
| 13 | The ground profile and its genesis | Ch. 2.1, Ch. 2.2, Ch. 2.13 new |
| 14 | Soils as particulate materials | Ch. 2.2, Ch. 2.3 |
| 15 | Groundwater profiles and effective stresses | Ch. 2.8 |
| 16 | Groundwater flow | Ch. 2.8, Ch. 6.4 |
| 17 | Strength and deformation behaviour of soils | Ch. 5.2, Ch. 2.4, Ch. 2.5 |
| 18 | Rock behaviour | Ch. 2.7 |
| 19 | Settlement and stress distributions | Ch. 6.2 |
| 20 | Earth pressure theory | Ch. 7.1 |
| 21 | Bearing capacity theory | Ch. 6.1 |
| 22 | Behaviour of single piles under vertical loads | Ch. 6.1 |
| 23 | Slope stability | Ch. 6.3, Ch. 3.8 |
| 24 | Dynamic and seismic loading of soils | Ch. 6.5, Ch. 2.3 |
| 25 | The role of ground improvement | Ch. 7.2 |
| 26 | Building response to ground movements | Ch. 6.2, Ch. 3.8 |
| 27 | Geotechnical parameters and safety factors | Ch. 5.2, App D |
| ICE Ch. | ICE chapter title | GHRM chapters |
|---|---|---|
| 28 | Introduction to Section 3 | Ch. 2.9 new |
| 29 | Arid soils | Ch. 2.13 new |
| 30 | Tropical soils | Ch. 2.13 new |
| 31 | Glacial soils | Ch. 2.4, Ch. 2.5, Ch. 2.13 new |
| 32 | Collapsible soils | Ch. 2.9 new, Ch. 2.4 |
| 33 | Expansive soils | Ch. 2.5, Ch. 2.13 new |
| 34 | Non-engineered fills | Ch. 2.10 new |
| 35 | Organics/peat soils | Ch. 2.6 |
| 36 | Mudrocks, clays and pyrite implications | Ch. 2.5, Ch. 2.12 new |
| 37 | Sulfates and sulfides in soils and rocks | Ch. 2.12 new |
| 38 | Soluble ground | Ch. 2.11 new |
| ICE Ch. | ICE chapter title | GHRM chapters |
|---|---|---|
| 39 | Introduction to Section 4 | Ch. 3.9 |
| 40 | The ground as a hazard | Ch. 3.8, Ch. 1.1, Ch. 3.5, Ch. 2.11 new, Ch. 3.10 new |
| 41 | Man-made hazards and obstructions | Ch. 3.10 new, Ch. 5.4 new |
| 42 | Roles and responsibilities | Ch. 3.1, Ch. 8.1 |
| 43 | Preliminary studies | Ch. 3.2, Ch. 3.4, Ch. 3.10 new |
| 44 | Planning, procurement and management | Ch. 3.9, Ch. 3.3, Ch. 3.1, Ch. 3.7 |
| 45 | Geophysical exploration and remote sensing | Ch. 5.1, Ch. 3.2, Ch. 2.11 new |
| 46 | Ground exploration | Ch. 4.1 |
| 47 | Field geotechnical testing | Ch. 5.1 |
| 48 | Geo-environmental testing | Ch. 5.4 new |
| 49 | Sampling and laboratory testing | Ch. 4.1, Ch. 5.2 |
| 50 | Geotechnical reporting | Ch. 8.4, Ch. 8.3 |
| ICE Ch. | ICE chapter title | GHRM chapters |
|---|---|---|
| 51 | Introduction to Section 5 | Ch. 6.1 |
| 52 | Foundation types and conceptual design principles | Ch. 6.1 |
| 53 | Shallow foundations | Ch. 6.1, Ch. 6.2 |
| 54 | Single piles | Ch. 6.1 |
| 55 | Pile-group design | Ch. 6.1 |
| 56 | Rafts and piled rafts | Ch. 6.1 |
| 57 | Global ground movements and their effects on piles | Ch. 6.1, Ch. 6.3 |
| 58 | Building on fills | Ch. 2.10 new, Ch. 2.9 new |
| 59 | Design principles for ground improvement | Ch. 7.2 |
| 60 | Foundations subjected to cyclic and dynamic loads | Ch. 2.3, Ch. 6.5 |
| ICE Ch. | ICE chapter title | GHRM chapters |
|---|---|---|
| 61 | Introduction to Section 6 | Ch. 7.1 |
| 62 | Types of retaining walls | Ch. 7.1 |
| 63 | Principles of retaining wall design | Ch. 7.1 |
| 64 | Geotechnical design of retaining walls | Ch. 7.1 |
| 65 | Geotechnical design of retaining wall support systems | Ch. 7.1 |
| 66 | Geotechnical design of grouted anchors | Ch. 7.1 |
| 67 | Retaining walls as part of complete underground structure | Ch. 7.1 |
| ICE Ch. | ICE chapter title | GHRM chapters |
|---|---|---|
| 68 | Introduction to Section 7 | Ch. 7.4 new |
| 69 | Earthworks design principles | Ch. 7.4 new, Ch. 6.3 |
| 70 | Design of new earthworks | Ch. 7.4 new, Ch. 2.3, Ch. 2.10 new |
| 71 | Earthworks asset management and remedial design | Ch. 7.4 new, Ch. 3.8, Ch. 2.10 new |
| 72 | Slope stabilisation methods | Ch. 7.4 new, Ch. 6.3, Ch. 7.2 |
| 73 | Design of soil reinforced slopes and structures | Ch. 7.1, Ch. 7.2 |
| 74 | Design of soil nails | Ch. 7.1 |
| 75 | Earthworks material specification, compaction and control | Ch. 5.3, Ch. 7.3 |
| 76 | Pavement foundation design | Ch. 7.3, Ch. 2.3 |
| ICE Ch. | ICE chapter title | GHRM chapters |
|---|---|---|
| 77 | Introduction to Section 8 | Ch. 5.3 |
| 78 | Procurement and specification | Ch. 3.1, Ch. 8.2 |
| 79 | Sequencing of geotechnical works | Ch. 5.3, Ch. 5.5 new |
| 80 | Groundwater control | Ch. 2.8, Ch. 6.4 |
| 81 | Types of bearing piles | Ch. 6.1 |
| 82 | Piling problems | Ch. 5.3, Ch. 6.1 |
| 83 | Underpinning | Ch. 7.2 |
| 84 | Ground improvement | Ch. 7.2 |
| 85 | Embedded walls | Ch. 7.1 |
| 86 | Soil reinforcement construction | Ch. 7.1, Ch. 7.2 |
| 87 | Rock stabilisation | Ch. 2.7, Ch. 7.4 new |
| 88 | Soil nailing construction | Ch. 7.1 |
| 89 | Grouted anchor construction | Ch. 7.1 |
| 90 | Geotechnical grouting and soil mixing | Ch. 7.2, Ch. 2.11 new |
| 91 | Modular foundations and retaining walls | Ch. 7.1 |
| ICE Ch. | ICE chapter title | GHRM chapters |
|---|---|---|
| 92 | Introduction to Section 9 | Ch. 5.3 |
| 93 | Quality assurance | Ch. 5.3, Ch. 8.4 |
| 94 | Principles of geotechnical monitoring | Ch. 5.3, Ch. 5.5 new |
| 95 | Types of geotechnical instrumentation and their usage | Ch. 5.3, Ch. 5.5 new |
| 96 | Technical supervision of site works | Ch. 5.3, Ch. 5.5 new |
| 97 | Pile integrity testing | Ch. 5.3 |
| 98 | Pile capacity testing | Ch. 5.3, Ch. 6.1 |
| 99 | Materials and material testing for foundations | Ch. 5.2, Ch. 5.3, Ch. 2.12 new |
| 100 | Observational method | Ch. 5.5 new |
| 101 | Close-out reports | Ch. 8.4 |
The reverse index: for each GHRM chapter, the ICE chapters to read alongside it (shown as volume-chapter, e.g. I-32 = Volume I, Chapter 32).
| GHRM | Title | ICE chapters |
|---|---|---|
| Chapter 1.0 | Manual Overview | I-1, I-2, I-3, I-4, I-10, I-11 |
| Chapter 1.1 | Introduction to Railway Ground Hazard Risk Management | I-7, I-40 |
| Chapter 2.1 | Track Foundation Elements | I-12, I-13 |
| Chapter 3.8 | Failure Mechanisms and Triggers | I-23, I-26, I-40 |
| Chapter 2.2 | Soil and Rock Classification | I-13, I-14 |
| Chapter 2.3 | Track Substructure: Ballast, Subballast and Subgrade | I-14, I-24, II-60, II-70, II-76 |
| Chapter 2.4 | Silts: Properties, Typical Values and Liquefaction | I-17, I-31, I-32 |
| Chapter 2.5 | Clays: Properties, Typical Values and Behavior | I-17, I-31, I-33, I-36 |
| Chapter 2.6 | Peats and Organic Soils: Properties, Typical Values and Behavior | I-35 |
| Chapter 2.7 | Rock and Sand: Properties, Typical Values and Behavior | I-18, II-87 |
| Chapter 2.8 | Groundwater Characterization and Seepage | I-15, I-16, II-80 |
| Chapter 2.9 | Collapsible Soils: Identification, Testing and Railroad Impacts | I-28, I-32, II-58 |
| Chapter 2.10 | Non-Engineered Fills: Old Embankments, Waste and Made Ground | I-34, II-58, II-70, II-71 |
| Chapter 2.11 | Soluble Ground and Karst: Sinkholes, Voids and Dissolution | I-38, I-40, I-45, II-90 |
| Chapter 2.12 | Sulfates, Sulfides and Problem Mudrocks | I-36, I-37, II-99 |
| Chapter 2.13 | Residual, Tropical and Arid Soils | I-13, I-29, I-30, I-31, I-33 |
| Chapter 3.1 | Scoping Proposals | I-42, I-44, II-78 |
| Chapter 3.2 | Desktop Study | I-43, I-45 |
| Chapter 3.3 | Drilling Scope | I-44 |
| Chapter 3.4 | Site Review and Reconnaissance | I-43 |
| Chapter 3.5 | Site Conditions | I-40 |
| Chapter 3.6 | Site Accessibility Study | — (railroad-specific; no direct ICE equivalent) |
| Chapter 3.7 | Cost Estimates | I-44 |
| Chapter 3.8 | Risk Ratings | I-7, II-71 |
| Chapter 3.8 | Ground Hazard Risk Assessment | I-7 |
| Chapter 3.9 | Geotechnical Investigation Planning and Scope | I-4, I-8, I-39, I-44 |
| Chapter 3.10 | Mining and Man-Made Hazards | I-8, I-40, I-41, I-43 |
| Chapter 4.1 | Borings and Sampling | I-8, I-46, I-49 |
| Chapter 5.1 | In Situ Testing | I-45, I-47 |
| Chapter 5.2 | Laboratory Testing Program | I-17, I-27, I-49, II-99 |
| Chapter 5.3 | Construction Monitoring and Field Testing | II-75, II-77, II-79, II-82, II-92, II-93, II-94, II-95, II-96, II-97, II-98, II-99 |
| Chapter 5.4 | Geo-Environmental Testing on Railroad Corridors | I-8, I-41, I-48 |
| Chapter 5.5 | The Observational Method and Trigger-Action Response Plans | II-79, II-94, II-95, II-96, II-100 |
| Chapter 6.1 | Foundation Engineering: Bearing Capacity | I-5, I-9, I-21, I-22, II-51, II-52, II-53, II-54, II-55, II-56, II-57, II-81, II-82, II-98 |
| Chapter 6.2 | Settlement Analysis | I-5, I-6, I-19, I-26, II-53 |
| Chapter 6.3 | Slope Stability Analysis | I-6, I-23, II-57, II-69, II-72 |
| Chapter 6.4 | Infiltration and Seepage | I-16, II-80 |
| Chapter 6.5 | Seismic Hazard and Liquefaction | I-24, II-60 |
| Chapter 7.1 | Retaining Structures | I-9, I-20, II-61, II-62, II-63, II-64, II-65, II-66, II-67, II-73, II-74, II-85, II-86, II-88, II-89, II-91 |
| Chapter 7.2 | Ground Improvement Methods | I-11, I-25, II-59, II-72, II-73, II-83, II-84, II-86, II-90 |
| Chapter 7.3 | Pavement Subgrade Evaluation | II-75, II-76 |
| Chapter 7.4 | Earthworks Asset Management and Remedial Design | II-68, II-69, II-70, II-71, II-72, II-87 |
| Chapter 8.1 | Exploration Versus Investigation | I-42 |
| Chapter 8.2 | Change Orders | II-78 |
| Chapter 8.3 | Memorandums | I-50 |
| Chapter 8.4 | Geotechnical Report Preparation | I-50, II-93, II-101 |
| Appendices A–C | Appendices | — (railroad-specific; no direct ICE equivalent) |
| Appendix D | Typical Soil Properties | I-27 |
| Appendix F | Analytical Equations | — (railroad-specific; no direct ICE equivalent) |
Comparing the two manuals chapter by chapter showed that the GHRM already covered most ICE subjects, often in more railroad-specific depth (track substructure, ballast, risk ratings, desktop study and cost). The ICE Manual covered nine subjects that the GHRM did not treat as chapters. These were written as new GHRM chapters in original wording, English units and railroad context, each with a worked example in the GHRM five-part format, and numbered so that no existing chapter was renumbered.
| GHRM | Title | Parallel ICE chapters |
|---|---|---|
| Ch. 2.9 | Collapsible Soils: Identification, Testing and Railroad Impacts | I-28, I-32, I-29, II-58 |
| Ch. 2.10 | Non-Engineered Fills: Old Embankments, Waste and Made Ground | I-34, II-58, II-70, II-71 |
| Ch. 2.11 | Soluble Ground and Karst: Sinkholes, Voids and Dissolution | I-38, I-40, I-45, II-90 |
| Ch. 2.12 | Sulfates, Sulfides and Problem Mudrocks | I-36, I-37, II-99 |
| Ch. 2.13 | Residual, Tropical and Arid Soils | I-13, I-29, I-30, I-31, I-33 |
| Ch. 3.10 | Mining and Man-Made Hazards | I-40, I-41, I-8, I-43 |
| Ch. 5.4 | Geo-Environmental Testing on Railroad Corridors | I-48, I-41, I-8 |
| Ch. 5.5 | The Observational Method and Trigger-Action Response Plans | II-100, II-94, II-95, II-96, II-79 |
| Ch. 7.4 | Earthworks Asset Management and Remedial Design | II-68, II-69, II-70, II-71, II-72, II-87 |
Subjects the GHRM covers that have no direct ICE chapter include the railroad track substructure, the risk ratings and risk assessment framework, the desktop study and site accessibility study, cost estimates and change orders. These reflect the GHRM's purpose as a railroad ground hazard manual rather than a general geotechnical text.