Subsections
14Primary references: FHWA and FTA (2005) Highway and Rail Transit Tunnel Inspection Manual; FHWA (2015) TOMIE Manual; Barton, Lien and Lunde (1974) and Grimstad and Barton (1993), Q-system; Feng (ed.) (2017), Rock Mechanics and Engineering, Vol. 4.
- 6.6.0Purpose and Overviewopen →
- 6.6.1Railroad Tunnel Types and Typical Problemsopen →
- 6.6.2Inventory and Inspectionopen →
- 6.6.3Lining Defects and Their Causesopen →
- 6.6.4Rock in Unlined Tunnels: Q-System Checks and Rock Supportopen →
- 6.6.5Squeezing and Swelling Groundopen →
- 6.6.6Portalsopen →
- 6.6.7Water, Drainage and Iceopen →
- 6.6.8Clearance Improvement Projectsopen →
- 6.6.9Repair and Rehabilitation Methodsopen →
- 6.6.10Monitoring Existing Tunnelsopen →
- 6.6.11Risk Rating for Tunnelsopen →
- 6.6.12Practice Questionsopen →
- 6.6.13Referencesopen →