Subsections
22Primary Reference: USACE EM 1110-1-1804, Geotechnical Investigations (January 2001); ASCE 7-22; AASHTO Guide Specifications for LRFD Seismic Bridge Design (2011, 2nd Ed.); Youd et al. (2001), ASCE J. Geotech. Geoenviron. Eng.; Robertson & Wride (1998); Tokimatsu & Seed (1987); Seed & Harder (1990).
- 6.5.0Executive Summaryopen →
- ·Empirical Equations — Use and Limitationsopen →
- 6.5.1Background and Railroad Contextopen →
- 6.5.2Probabilistic Seismic Hazard Analysis (PSHA) Frameworkopen →
- 6.5.3Site Classification and Ground Motion Amplificationopen →
- 6.5.4Liquefaction Triggering — Seed-Idriss Simplified Procedureopen →
- 6.5.5Cyclic Resistance Ratio from SPT Dataopen →
- 6.5.6Cyclic Resistance Ratio from CPT Dataopen →
- 6.5.7Post-Liquefaction Consequencesopen →
- 6.5.8Newmark Sliding Block Analysisopen →
- 6.5.9Client-Specific Seismic Requirementsopen →
- 6.5.10Worked Examplesopen →
- 6.5.11Representative Data Tableopen →
- 6.5.12Reference Photographsopen →
- 6.5.13Practical Recommendationsopen →
- 6.5.14Seismic Hazard and Liquefaction Investigation Checklistopen →
- 6.5.15Practice Questionsopen →
- 6.5.16Cross-Referencesopen →
- 6.5.17Apps and Analytical Tools 5open →
- 6.5.18Critical Speed and Train-Induced Ground Vibrationopen →
- ·Author and Sourcesopen →
- ·Supplemental Referencesopen →
Apps
3 appsChapter 6.5 · Section 6.5.5.4Liquefaction Triggering (SPT)Layer-by-layer SPT procedure: corrections, fines adjustment, CSR, CRR, magnitude scaling and factor of safety, with a profile chart.Chapter 6.5 · Section 6.5.18Critical Speed on Soft GroundRayleigh wave critical speed from shear wave velocity, the two-thirds speed limit, and the stiffness needed to meet a remediation ratio.Chapter 6.5 · Section 6.5.8.1Seismic Slope Displacement (Newmark)Static and pseudo-static factors of safety, the yield coefficient by bisection, and Newmark one-way sliding block displacement for sine pulses, a rectangular pulse or a pasted acceleration record, for an infinite slope or a rock plane failure.