Subsections
13This chapter covers infiltration and seepage for railroad earthworks: rainfall infiltration and wetting fronts, loss of suction in unsaturated soil, steady seepage and seepage forces, internal erosion and filters, pore pressures in slopes, field infiltration testing and drainage design. Water is the most common trigger of railroad ground hazards (Section 3.8.18), so this chapter connects the analysis to the trigger and live ratings of Chapter 3.8.
- 6.4.0Purpose and Overviewopen →
- 6.4.1Rainfall Infiltrationopen →
- 6.4.2Unsaturated Soil Behavioropen →
- 6.4.3Steady Seepage and Flow Netsopen →
- 6.4.4Internal Erosion and Pipingopen →
- 6.4.5Pore Pressures in Slopesopen →
- 6.4.6Drainage Designopen →
- 6.4.7Field Infiltration Testingopen →
- 6.4.8Cross-Referencesopen →
- 6.4.9Apps and Analytical Tools 10open →
- 6.4.10Ballast Fouling Indices and Drainage Capacityopen →
- 6.4.11Rainfall, Matric Suction and Shallow Slope Failureopen →
- 6.4.12Seasonal Pore Pressure in Clay-Fill Embankmentsopen →
Apps
2 appsChapter 6.4 · Section 6.4.10Ballast Fouling and DrainageFouling index, four-sieve index, single-sieve category, void contaminant index, fouled conductivity and drainage class.Chapter 6.4 · Section 6.4.11Rainfall, Suction and Shallow SlidesSteady suction and effective saturation profiles above the water table for a given infiltration or evaporation rate, and the infinite-slope factor of safety with depth, with and without suction.