Subsections
22Railroad Geotechnical Services Manual | Primary Source: USACE EM 1110-1-1804 All equations and parameters expressed in English (Imperial) units throughout.
- ·Executive Summaryopen →
- ·Empirical Equations — Use and Limitationsopen →
- 6.2.1Background and Railroad Contextopen →
- 6.2.2Stress Increase in Soil — Boussinesq Distributionopen →
- 6.2.3Immediate (Elastic) Settlementopen →
- 6.2.4Primary Consolidation Settlementopen →
- 6.2.5Time Rate of Consolidationopen →
- 6.2.6Secondary Compression (Creep) Settlementopen →
- 6.2.7Total Settlement and Angular Distortionopen →
- 6.2.8Preloading and Surcharge Designopen →
- 6.2.9Representative Data Tableopen →
- 6.2.10Reference Photographsopen →
- 6.2.11Worked Calculation Examplesopen →
- 6.2.12Practical Recommendationsopen →
- 6.2.13Settlement Analysis Checklistopen →
- 6.2.14Practice Questions and Full Answersopen →
- 6.2.15Cross-Referencesopen →
- 6.2.16Case Studiesopen →
- 6.2.17Apps and Analytical Tools 18open →
- 6.2.18Deformation of Embankments on Improved Soft Groundopen →
- ·Author and Sourcesopen →
- ·Supplemental Referencesopen →
Apps
2 appsChapter 6.2 · Section 6.2.4.3Consolidation Settlement and Time RateSublayered consolidation settlement under a wide fill or a footing (2:1), time to 50% and 90% consolidation, secondary compression, and a settlement-time curve.Chapter 6.2 · Section 6.2.8.1Precompression SurchargeEffective stress at clay mid-depth, degree of consolidation in the time available (mid-depth or average), the surcharge ratio and fill height to remove primary settlement, and the settlement to wait for before removal.