Silt is the fine, low-plasticity fraction of soil: particles that pass the No. 200 sieve (0.0029 in.) but are coarser than clay (about 0.00008 in.), with little or none of the clay minerals that make clay sticky and cohesive. Silts are classified ML or MH under the Unified Soil Classification System, and a great deal of railroad ground classed as CL-ML, SM or "lean clay" behaves like silt.
The engineering problems come from four properties that occur together in silt and in no other soil to the same degree:
- High capillarity with useful permeability. Silt pores are small enough to lift water several feet above the water table and large enough to deliver it to a freezing front. Silts are the most frost-susceptible soils (USACE group F4).
- Low plasticity. Silt has little true cohesion. Its strength comes from friction and, above the water table, from suction. Wetting removes the suction, so silt cut slopes, loess bluffs and dry-compacted fills lose strength when they get wet.
- Low particle weight. Silt grains are light and loosely bonded, so silt erodes, pipes and pumps more readily than sand or clay.
- Contractive, sand-like behavior under cyclic load. Loose saturated non-plastic and low-plasticity silt (PI below about 7) can liquefy in an earthquake much as sand does. Higher-plasticity silt softens cyclically instead of liquefying.
This chapter collects typical values, correlations and equations for silts, and gives the screening and design steps for each problem. Section 2.4.2 covers identification; Sections 2.4.3 to 2.4.6 give typical properties; Sections 2.4.7 and 2.4.8 cover water and frost; Section 2.4.9 covers liquefaction; Section 2.4.10 covers loess and other special silts; and Section 2.4.11 turns all of it into earthwork guidance.
Use of the values in this chapter. The ranges are typical values compiled from the published sources listed under Author and Sources. They are for screening, checking laboratory results and preliminary design. Site-specific testing governs final design.