Starting values for preliminary design where only classification and blow counts are available. Replace with tested values as soon as they exist.
| Soil | SPT N60 (blows/ft) | γ (pcf) | φ′ (deg) | c′ (psf) | su (psf) | Cc/(1+e0) | Es (ksf) | Soaked CBR |
|---|---|---|---|---|---|---|---|---|
| ML, very loose to loose, saturated | 0–4 | 105–115 | 27–30 | 0 | Partly drained; use effective stress | 0.06–0.12 | 30–60 | 2–4 |
| ML, medium dense | 5–15 | 115–122 | 30–33 | 0 | — | 0.04–0.08 | 70–130 | 4–8 |
| ML, dense | 16–30 | 120–128 | 32–36 | 0–100 | — | 0.02–0.05 | 140–230 | 6–12 |
| MH, soft to firm | 2–8 | 95–110 | 23–27 | 0–100 | 250–750 | 0.12–0.25 | 20–60 | 2–4 |
| MH, stiff | 9–20 | 105–115 | 26–30 | 50–200 | 750–2,000 | 0.08–0.15 | 60–150 | 3–6 |
| CL-ML, firm to stiff | 5–15 | 118–126 | 28–32 | 50–150 | 500–1,500 | 0.04–0.08 | 60–130 | 3–8 |
| Loess, dry (above water table) | 8–20 | 95–110 | 30–34 | 200–800 (apparent) | — | Collapse governs | 100–200 (dry) | 4–8 |
| Micaceous saprolite (ML/MH) | 6–25 | 105–118 | 27–32 | 0–200 | — | 0.06–0.15 | 60–200 | 3–8 |
Es from Eq. 2.4-10 rounded. c′ for loess is apparent cohesion from suction and cementation; set to zero for wetted conditions.