↑ Parent Menu⌂ Main Menu
← Chapter 2.4 Silts: Properties, Typical Values and Liquefaction
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.4.3 Typical Index and Physical Properties

Silt sits between sand and clay: too fine to drain freely, too coarse and too weakly plastic to hold together when wet. That combination makes it the soil most often behind track pumping, frost heave, piping, sloughing cut slopes, collapsing loess and liquefaction of fine-grained ground.
Author: Daniel P. Colwell
2.4.3 Typical Index and Physical Properties

Table 2.4-5 gives typical ranges for the main silt types. Use it to check laboratory results for reasonableness and for preliminary design before testing is complete.

Table 2.4-5: Typical Index and Physical Properties of Silts
PropertyMLMH (elastic silt)CL-MLLoessMicaceous saprolite (ML/MH)
Specific gravity, Gs2.65–2.752.65–2.80 (diatomaceous 2.0–2.5)2.65–2.722.65–2.722.70–2.90
Liquid limit, LL25–4550–8020–3025–3535–60
Plasticity index, PINP–1215–354–7NP–125–20
Natural water content, w (%)15–3530–6012–258–20 above water table20–45
Total unit weight, γ (pcf)110–12595–115115–12895–115100–120
Dry unit weight, γd (pcf)85–10560–8595–11075–9570–95
Void ratio, e0.5–1.11.0–2.00.4–0.80.8–1.20.8–1.5
Permeability, k (ft/day)0.003–30.0003–0.030.0003–0.030.03–3 (vertical > horizontal)0.003–0.3
Capillary rise above water table (ft)3–2510–30+10–30+3–155–25
USACE frost groupF4F4F4F4F4

NP = non-plastic. Ranges compiled from Holtz, Kovacs and Sheahan (2011), Kulhawy and Mayne (1990), Terzaghi, Peck and Mesri (1996) and USACE EM 1110-3-138; site values govern.

Phase relationships

The basic phase relationships are used throughout this chapter, in particular to check whether a silt is loose enough to collapse or liquefy:

γd = γ1 + w     e = Gs γwγd − 1     wsat = eGs = γwγd − 1Gs

Eq. 2.4-4 (γw = 62.4 pcf)

Capillary rise

Hazen's approximation for the height of capillary rise, written for D10 in inches and hc in feet:

hc = C′e · D10

Eq. 2.4-5

Where:

  • hc = height of capillary rise above the water table (ft)
  • C′ = empirical constant, 0.0013 to 0.0065 ft·in. (equivalent to Hazen's 0.1 to 0.5 cm2); use the low end for clean, rounded grains
  • e = void ratio; D10 = effective grain size (in.)

For a typical silt with D10 = 0.0004 in. and e = 0.75, hc is 4 to 22 ft. Anywhere the water table is within that distance of the subgrade, the subgrade should be treated as wet in design, whatever its water content on the day of the boring.

← Previous · 2.0 The Underworld Chapter 2.3 — Track Substructure: Ballast, Subballast and Subgrade
Next · 2.0 The Underworld → Chapter 2.5 — Clays: Properties, Typical Values and Behavior