↑ Parent Menu⌂ Main Menu
← Chapter 2.4 Silts: Properties, Typical Values and Liquefaction
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.4.13 Worked Examples

Silt sits between sand and clay: too fine to drain freely, too coarse and too weakly plastic to hold together when wet. That combination makes it the soil most often behind track pumping, frost heave, piping, sloughing cut slopes, collapsing loess and liquefaction of fine-grained ground.
Author: Daniel P. Colwell
2.4.13 Worked Examples
The examples use generic sites and are not taken from any client project. Examples 2.4-1 to 2.4-3 follow one floodplain site from classification to the two kinds of seismic check that silts need; Examples 2.4-4 and 2.4-5 cover the two other silt problems most often met on railroads, frost and collapse. Each is laid out as Given, Required, Equations, a flow chart of the steps with a spot check at each, and the Solution.
Example 2.4-1: Classification and Liquefaction Susceptibility of Floodplain Silts

A low embankment crosses a river floodplain in a seismic region, and two silt layers lie below the water table. Silts are where the two liquefaction screens disagree most often, so the first question for each layer is not whether it will liquefy but which kind of analysis it needs: a sand-like triggering analysis or a clay-like cyclic softening analysis.

CrustLayer A: LL 31, PI 6, w 29%, fines 78%Layer B: LL 58, PI 24, w 45%, fines 96%051015202530Depth (ft)GWT 5 ftUSCS = ? Analysis = ?USCS = ? Analysis = ?Floodplain silts under the lineGivenA (5–18 ft): LL 31, PI 6, w 29%B (18–30 ft): LL 58, PI 24, w 45%Boulanger and Idriss: PI < 7 sand-likeBray and Sancio: w/LL ≥ 0.85 andPI ≤ 12 susceptible; PI > 18 notRequiredUSCS group of each layerLiquefaction analysis for eachBlack = given; red = required
Given and required for Example 2.4-1.

Given

VariableValueDescription
Layer A5 to 18 ft; LL = 31, PI = 6, w = 29%, fines = 78%Upper silt
Layer B18 to 30 ft; LL = 58, PI = 24, w = 45%, fines = 96%Lower silt
Screen 1Boulanger and Idriss: PI < 7 sand-like; otherwise clay-likeSection 2.4.8
Screen 2Bray and Sancio: w/LL ≥ 0.85 and PI ≤ 12 susceptible; PI > 18 not susceptibleSection 2.4.8

Required

  • USCS group of each layer
  • Which liquefaction analysis each layer needs

Equations

  1. Eq. 2.4-1: PIA = 0.73 (LL − 20) — A-line
  2. Eq. 2: w / LL — Bray and Sancio water content ratio

Steps

Step 1 · Layer A: A-line
0.73 (31 − 20) = 8.0; PI = 6 < 8.0; LL < 50
ML; 22% coarse ≥ 15%: silt with sand
↓
Step 2 · Layer B: A-line
0.73 (58 − 20) = 27.7; PI = 24 < 27.7; LL ≥ 50
MH, elastic silt
↓
Step 3 · Boulanger and Idriss
A: PI = 6 < 7; B: PI = 24
A sand-like; B clay-like
↓
Step 4 · Bray and Sancio (Eq. 2)
A: 29 / 31 = 0.94 ≥ 0.85 and PI ≤ 12; B: 45 / 58 = 0.78 and PI > 18
A susceptible; B not susceptible
Spot check: The two screens agree for both layers, so there is no borderline call to make.
↓
Solution
A: ML, sand-like, check triggering. B: MH, clay-like, check cyclic softening.

Solution

Layer A is ML (silt with sand) and sand-like: evaluate liquefaction triggering (Example 2.4-2). Layer B is MH (elastic silt) and clay-like: evaluate cyclic softening (Example 2.4-3).

Both layers are silts and both plot below the A-line, yet they behave differently in an earthquake. Layer A’s low plasticity and high water content let it build pore pressure and liquefy; Layer B’s plasticity makes it soften gradually instead. Choosing the wrong analysis is a common error with silts and can be unconservative either way.

Example 2.4-2: SPT Triggering in a Sandy Silt

Layer A of Example 2.4-1 screened as sand-like, so it is checked with the simplified SPT triggering procedure of Youd et al. (2001). The calculation compares the cyclic stress the earthquake applies (CSR) with the cyclic resistance the soil has (CRR).

γ = 115 pcfSandy silt (Layer A), γ = 120 pcf, FC 35%0510152025Depth (ft)GWT 5 ftN60 = 9 at z = 15 ftCSR, CRR7.5, FSL = ?Givenz = 15 ft; GWT 5 ftγ 115 above, 120 pcf belowN60 = 9; FC = 35%amax = 0.20g; Mw as givenMSF = 1.19; Kσ = 1.0RequiredCSRCRR7.5FSLBlack = given; red = required
Given and required for Example 2.4-2.

Given

VariableValueDescription
z15 ftDepth of the check, in Layer A
zw5 ftDepth to water
γ115 pcf above, 120 pcf below the water tableUnit weights
N609Energy-corrected blow count
FC35%Fines content of the cleaner sample used for the check
amax0.20gDesign peak ground acceleration
Mw8.0Design magnitude
MSF1.19Magnitude scaling factor for Mw 7.0 (Table 6.5-3)
Kσ1.0Overburden correction (σ′v < 2,117 psf)

Required

  • Cyclic stress ratio CSR
  • Cyclic resistance ratio CRR7.5
  • Factor of safety against liquefaction FSL

Equations

  1. Eq. 1: σv, u = γw(z − zw), σ′v = σv − u — stresses
  2. Eq. 2.4-15: rd = 1.0 − 0.00765 z — stress reduction, z in ft ≤ 29.5
  3. Eq. 2: CSR = 0.65 (σv/σ′v)(amax/g) rd — Seed and Idriss
  4. Eq. 3: CN = (2,117 / σ′v)0.5; (N1)60 = CN N60 — overburden normalization
  5. Eq. 2.4-16: (N1)60,cs = α + β(N1)60; α = 5.0, β = 1.2 for FC ≥ 35% — fines correction
  6. Eq. 2.4-17: CRR7.5 = 1/(34 − N) + N/135 + 50/(10N + 45)² − 1/200, N = (N1)60,cs — Youd et al. (2001)
  7. Eq. 4: FSL = CRR7.5 MSF Kσ / CSR

Steps

Step 1 · Stresses (Eq. 1)
σv = 5(115) + 10(120) = 1,775 psf; u = 10(62.4) = 624 psf
σ′v = 1,151 psf
↓
Step 2 · rd and CSR (Eq. 2.4-15, Eq. 2)
rd = 1 − 0.00765(15) = 0.885; CSR = 0.65 (1,775/1,151)(0.20)(0.885)
CSR = 0.177
Spot check: 1,775/1,151 = 1.542; 0.65 × 1.542 = 1.002; × 0.20 × 0.885 = 0.177.
↓
Step 3 · (N1)60 (Eq. 3)
CN = (2,117/1,151)0.5 = 1.36; 1.36 × 9
(N1)60 = 12.2
↓
Step 4 · Clean-sand equivalent (Eq. 2.4-16)
5.0 + 1.2(12.2)
(N1)60,cs = 19.6
↓
Step 5 · CRR7.5 (Eq. 2.4-17)
0.0694 + 0.1452 + 0.0009 − 0.0050
CRR7.5 = 0.211
Spot check: 1/14.4 = 0.0694; 19.6/135 = 0.1452; 50/241² = 0.0009.
↓
Step 6 · FSL (Eq. 4)
0.211 × 1.19 × 1.0 / 0.177
FSL = 1.42
↓
Solution
FSL = 1.42: liquefaction not predicted, with a modest margin.

Solution

CSR = 0.177, CRR7.5 = 0.211 and FSL = 1.42. Liquefaction is not predicted.

The margin over a typical target of 1.2 to 1.3 (check the client criteria in Section 6.5.9) is modest. The layer’s typical fines content of 78% gives the same correction as 35%, because the correction stops increasing at 35%, so the answer is controlled by the blow count. One N-value of 9 is thin evidence in a variable floodplain silt; CPTu soundings to look for looser zones should come before the result is accepted.

Example 2.4-3: Cyclic Softening of an Elastic Silt

Layer B of Example 2.4-1 is clay-like, so it does not liquefy in the sand sense; it can soften under cyclic loading. The check compares the cyclic stress with a cyclic resistance taken from the soil’s undrained strength ratio (Boulanger and Idriss 2007).

γ = 115 pcfElastic silt (Layer B), γ = 108 pcf, OCR 1.5051015202530Depth (ft)GWT 5 ftz = 25 ft; S = 0.22, m = 0.8su/σ′v, CRR, CSR, FS = ?Givenz = 25 ft; GWT 5 ftγ 115 above, 108 pcf belowOCR = 1.5SHANSEP S = 0.22, m = 0.8amax = 0.20g, Mw = 7.0; Kα = 1.0RequiredStrength ratio and CRRCSR and FS againstcyclic softeningBlack = given; red = required
Given and required for Example 2.4-3.

Given

VariableValueDescription
z25 ftDepth of the check, in Layer B
zw5 ftDepth to water
γ115 pcf above; 108 pcf below the water tableUnit weights (108 pcf applied conservatively to the full 20 ft)
OCR1.5Lightly overconsolidated
S, m0.22 and 0.8SHANSEP parameters
amax, Mw0.20g; 7.0Same earthquake as Example 2.4-2
Kα1.0Level ground

Required

  • Undrained strength ratio and CRR
  • CSR and the factor of safety against cyclic softening

Equations

  1. Eq. 2.4-6: su/σ′v = S (OCR)m — Ladd and Foott
  2. Eq. 2.4-22: CRR7.5 = 0.8 (su/σ′v) Kα — cyclic resistance of clay-like soil
  3. Eq. 2.4-23: MSFclay = 1.12 exp(−Mw/4) + 0.828 — ≤ 1.13
  4. Eq. 2.4-15: rd = 1.0 − 0.00765 z
  5. Eq. 2: CSR = 0.65 (σv/σ′v)(amax/g) rd
  6. Eq. 3: FS = CRR7.5 MSFclay / CSR

Steps

Step 1 · Stresses
σv = 5(115) + 20(108) = 2,735 psf; u = 20(62.4) = 1,248 psf
σ′v = 1,487 psf
↓
Step 2 · Strength ratio (Eq. 2.4-6)
0.22 × 1.50.8 = 0.22 × 1.384
su/σ′v = 0.304; su ≈ 450 psf
↓
Step 3 · CRR and MSF (Eq. 2.4-22, 2.4-23)
0.8 × 0.304 × 1.0; 1.12 e−1.75 + 0.828 = 0.195 + 0.828
CRR7.5 = 0.243; MSFclay = 1.02
↓
Step 4 · CSR (Eq. 2.4-15, Eq. 2)
rd = 1 − 0.00765(25) = 0.809; 0.65 (2,735/1,487)(0.20)(0.809)
CSR = 0.193
↓
Step 5 · FS (Eq. 3)
0.243 × 1.02 / 0.193
FS = 1.29
Spot check: 0.243 × 1.02 = 0.248; 0.248 / 0.193 = 1.29.
↓
Solution
FS = 1.29 on level ground: significant cyclic softening not expected.

Solution

FS = 1.29 on level ground; significant cyclic softening is not expected.

Under the embankment side slope the static shear stress lowers the cyclic resistance (Kα < 1.0), so the check should be repeated beneath the slope. If the factor of safety there falls near 1.0, estimate the permanent displacement with a Newmark analysis (Chapter 6.5) rather than relying on the factor of safety alone.

Example 2.4-4: Capillary Rise and Frost Susceptibility of a Silt Subgrade

A yard track sits on a silt subgrade with the water table 6 ft down. Frost heave needs three things together: a frost-susceptible soil, freezing temperatures in it, and water supply. The capillary rise tells whether the water table can feed ice lenses in the frost zone.

TrackML silt subgrade: D10 = 0.0004 in., e = 0.75, 45% finer than 0.02 mmSeasonal high water, 6 ftFrost depth 5 ftCapillary rise hc = ?Frost group = ? Heave likely?Hazen C = 0.0013 to 0.0065 in.·ftGivenML silt; D10 = 0.0004 in.; e = 0.7545% finer than 0.02 mmWater table 6 ft below subgrade topDesign frost depth 5 ftC = 0.0013 to 0.0065 in.·ftRequiredRange of capillary riseFrost group; heave likely?Black = given; red = required
Given and required for Example 2.4-4.

Given

VariableValueDescription
SoilML silt; D10 = 0.0004 in.; e = 0.75Subgrade
Fines45% finer than 0.0008 in. (0.02 mm)Frost-critical fraction
zw6 ft below top of subgradeSeasonal high water table
zf5 ftDesign frost depth
C0.0013 to 0.0065 in.·ftHazen capillary constant, low and high estimates, in the units of Eq. 2.4-5

Required

  • Range of capillary rise
  • Frost group and whether frost heave is likely

Equations

  1. Eq. 2.4-5: hc = C / (e D10) — capillary rise (Hazen)

Steps

Step 1 · Capillary rise, low estimate
0.0013 / (0.75 × 0.0004)
hc = 4.3 ft
↓
Step 2 · Capillary rise, high estimate
0.0065 / (0.75 × 0.0004)
hc = 21.7 ft
↓
Step 3 · Does water reach the frost zone?
Low estimate: 6 − 4.3 = 1.7 ft below the subgrade surface; frost zone extends 5 ft down
Yes, even on the low estimate
↓
Step 4 · Frost group
ML with 45% finer than 0.02 mm (more than 3%)
F4
↓
Solution
F4 silt with capillary water in the frost zone: frost heave likely.

Solution

Capillary rise is 4.3 to 21.7 ft; even the low estimate brings water within 2 ft of the subgrade surface. The silt is group F4, and frost heave is likely.

All three conditions for heave in Section 3.8.8.1 are present. The remedies each remove one of them: lower the water table with underdrains (water), replace the silt within the frost depth with non-frost-susceptible material (soil), or insulate (freezing). The design should also allow for a reduced subgrade modulus during the spring thaw.

Example 2.4-5: Collapse Settlement of Loess Under a New Embankment

A 12-ft embankment for a second main track is planned over 10 ft of loess on dense till. Dry loess stands steeply and carries load well, but it can collapse when wetted under load. The first step screens whether collapse is likely; the second estimates how much.

New embankmentLoessγd = 82 pcf; Gs = 2.68; LL = 30; w = 11%εc = 6% at about 1.9 ksf (ASTM D4546)Dense tillH = 10 ftwettingCollapse screen? Settlement = ?GivenLoess H = 10 ft over dense tillγd = 82 pcf; Gs = 2.68LL = 30; w = 11%εc = 6% at design stressRequiredCollapse screeningSettlement if fully wettedBlack = given; red = required
Given and required for Example 2.4-5.

Given

VariableValueDescription
H10 ftLoess thickness above dense till
γd82 pcfDry unit weight
Gs2.68Specific gravity
LL30Liquid limit
w11%Natural water content
εc6%Collapse strain from ASTM D4546 at the design stress (about 1.9 ksf at mid-layer)

Required

  • Collapse screening
  • Collapse settlement if the full layer is wetted

Equations

  1. Eq. 2.4-24: wsat = γw/γd − 1/Gs — water content at saturation; collapse likely where wsat > LL
  2. Eq. 2.4-26: S = Σ εc H — collapse settlement of the layers expected to wet

Steps

Step 1 · Saturated water content (Eq. 2.4-24)
62.4/82 − 1/2.68 = 0.761 − 0.373
wsat = 38.8%
↓
Step 2 · Screen
38.8% > LL = 30%
Collapse is likely
Spot check: The soil would reach a water content above its liquid limit if saturated at its present density, so its structure cannot hold.
↓
Step 3 · Collapse settlement (Eq. 2.4-26)
0.06 × 10 ft
S = 0.6 ft = 7.2 in.
↓
Solution
About 7 in. of collapse settlement if the loess is wetted: not acceptable.

Solution

Collapse is likely, and wetting the full layer would add about 7.2 in. of settlement to the ordinary compression under the embankment.

Seven inches of differential settlement between the new and existing tracks is not acceptable. The options are to remove and recompact the loess under the new embankment, to pre-wet the foundation before building, or, where removal is not practical, to control every water source and build the ditches and culverts so that water stays away from the toe.

← Previous · 2.0 The Underworld Chapter 2.3 — Track Substructure: Ballast, Subballast and Subgrade
Next · 2.0 The Underworld → Chapter 2.5 — Clays: Properties, Typical Values and Behavior