Inorganic, non-plastic silt is only moderately compressible and consolidates quickly, so most of its settlement happens during construction. Elastic silt, organic silt and loess are the exceptions: MH and OL/OH can settle as much as soft clay, and loess can collapse (Section 2.4.10).
| Parameter | ML | MH | CL-ML | Organic silt (OL/OH) |
|---|---|---|---|---|
| Compression index, Cc | 0.10–0.30 | 0.30–0.80 | 0.08–0.20 | 0.40–1.5 |
| Recompression index, Cr | 0.01–0.05 | 0.03–0.10 | 0.01–0.04 | 0.05–0.20 |
| Coefficient of consolidation, cv (ft2/day) | 0.5–20 | 0.05–2 | 0.1–5 | 0.02–1 |
| Secondary compression, Cα/Cc | 0.03–0.05 | 0.03–0.05 | 0.03–0.05 | 0.05–0.07 |
| Young's modulus, Es (ksf) | 40–300 | 20–150 | 50–250 | 10–60 |
| Poisson's ratio, ν | 0.30–0.35 | 0.35–0.40 | 0.30–0.35 | 0.35–0.45 |
Ranges compiled from Terzaghi, Peck and Mesri (1996), Holtz, Kovacs and Sheahan (2011) and Bowles (1996).
Eq. 2.4-8 (Terzaghi and Peck, normally consolidated clays and silts of moderate sensitivity) and Eq. 2.4-9 (Hough 1957, inorganic silty soils)
Eq. 2.4-10 (after Bowles 1996, silts and sandy silts)
Primary consolidation settlement and time rate use the standard equations of Chapter 6.2, Sections 6.2.4 and 6.2.5:
Eq. 2.4-11 and Eq. 2.4-12 (Tv = 0.197 for 50% and 0.848 for 90% consolidation)