| Topic | Refer To |
|---|
| Frost heave, thaw weakening and silt liquefaction mechanisms | Chapter 3.8, Section 3.8.8 |
| Track subgrade failure modes, pumping and blanket layers | Chapter 2.3, Section 2.3.5; Section 2.3.4 |
| In situ testing (CPTu, dissipation tests) | Chapter 5.1, Section 5.1.2 |
| Grain size, Atterberg limits, USCS and AASHTO classification | Chapter 2.2, Sections 2.2.2–2.2.5 |
| Frost susceptibility classification | Chapter 2.2, Section 2.2.7 |
| Seepage analysis and exit gradients | Chapter 2.8, Section 2.8.5 |
| Laboratory test methods | Chapter 5.2, Section 5.2.3 |
| Consolidation settlement and time rate | Chapter 6.2, Sections 6.2.4–6.2.5 |
| Slope stability and residual strength | Chapter 6.3, Section 6.3.6 |
| Liquefaction triggering and consequences | Chapter 6.5, Sections 6.5.4–6.5.8 |
| Ground improvement (stabilization, DSM, drains) | Chapter 7.2, Sections 7.2.5–7.2.7 |
| Ground hazard risk assessment (GHSR worksheet) | Chapter 3.8 |
| Pavement subgrade and frost design | Chapter 7.3, Section 7.3.5 |
| Analytical equations | Appendix F |