Author: Daniel P. Colwell. This chapter was written and compiled by Daniel P. Colwell for Railway Ground Hazard Risk Management.
Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Typical-value ranges are compiled from several of these sources; site-specific testing governs design.
Primary sources
- Holtz, R. D., Kovacs, W. D. and Sheahan, T. C. (2011). An Introduction to Geotechnical Engineering, 2nd ed. PearsonFind source ↗
- Terzaghi, K., Peck, R. B. and Mesri, G. (1996). Soil Mechanics in Engineering Practice, 3rd ed. WileyFind source ↗
- Kulhawy, F. H. and Mayne, P. W. (1990). Manual on Estimating Soil Properties for Foundation Design. EPRI EL-6800Find source ↗
- Bowles, J. E. (1996). Foundation Analysis and Design, 5th ed. McGraw-HillFind source ↗
- Boulanger, R. W. and Idriss, I. M. (2006). “Liquefaction Susceptibility Criteria for Silts and Clays.” J. Geotech. Geoenviron. Eng., 132(11)Find source ↗
- Boulanger, R. W. and Idriss, I. M. (2007). “Evaluation of Cyclic Softening in Silts and Clays.” J. Geotech. Geoenviron. Eng., 133(6)Find source ↗
- Bray, J. D. and Sancio, R. B. (2006). “Assessment of the Liquefaction Susceptibility of Fine-Grained Soils.” J. Geotech. Geoenviron. Eng., 132(9)Find source ↗
- Idriss, I. M. and Boulanger, R. W. (2008). Soil Liquefaction During Earthquakes. EERI Monograph MNO-12Find source ↗
- Youd, T. L. et al. (2001). “Liquefaction Resistance of Soils: Summary Report from the 1996 NCEER and 1998 NCEER/NSF Workshops.” J. Geotech. Geoenviron. Eng., 127(10)Find source ↗
- Robertson, P. K. and Wride, C. E. (1998). “Evaluating Cyclic Liquefaction Potential Using the Cone Penetration Test.” Can. Geotech. J., 35(3)Find source ↗
- Seed, H. B. and Idriss, I. M. (1982). Ground Motions and Soil Liquefaction During Earthquakes. EERI; Wang, W. (1979). Some Findings in Soil Liquefaction. Water Conservancy and Hydroelectric Power Scientific Research Institute, BeijingFind source ↗
- Olson, S. M. and Stark, T. D. (2002). “Liquefied Strength Ratio from Liquefaction Flow Failure Case Histories.” Can. Geotech. J., 39(3)Find source ↗
- Ladd, C. C. and Foott, R. (1974). “New Design Procedure for Stability of Soft Clays.” J. Geotech. Eng. Div., ASCE, 100(GT7)Find source ↗
- Fredlund, D. G. and Rahardjo, H. (1993). Soil Mechanics for Unsaturated Soils. WileyFind source ↗
- Hough, B. K. (1957). Basic Soils Engineering. Ronald PressFind source ↗
- Gibbs, H. J. and Bara, J. P. (1962). “Predicting Surface Subsidence from Basic Soil Tests.” ASTM STP 322Find source ↗
- Jennings, J. E. and Knight, K. (1975). “A Guide to Construction on or with Materials Exhibiting Additional Settlement Due to Collapse of Grain Structure.” Proc. 6th Regional Conf. for Africa on SMFEFind source ↗
- U.S. Army Corps of Engineers (1984). EM 1110-3-138, Pavement Criteria for Seasonal Frost ConditionsOfficial page ↗
- USDA NRCS (2017). National Engineering Handbook, Part 633, Chapter 26, Gradation Design of Sand and Gravel FiltersFind source ↗
- FHWA (2008). Geosynthetic Design and Construction Guidelines, FHWA NHI-07-092Find source ↗
- Selig, E. T. and Waters, J. M. (1994). Track Geotechnology and Substructure Management. Thomas TelfordFind source ↗Library entry
- ASTM D2487, D2488, D4318, D4546, D6572, D4221, D4647, D698, D1557, D1883, D2435; AASHTO M 145, T 307Official page ↗Library entry