↑ Parent Menu⌂ Main Menu
← Chapter 2.4 Silts: Properties, Typical Values and Liquefaction
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.4.12 Summary of Equations

Silt sits between sand and clay: too fine to drain freely, too coarse and too weakly plastic to hold together when wet. That combination makes it the soil most often behind track pumping, frost heave, piping, sloughing cut slopes, collapsing loess and liquefaction of fine-grained ground.
Author: Daniel P. Colwell
2.4.12 Summary of Equations
Table 2.4-17: Equations for Silts in This Chapter
Eq.QuantityExpressionUse and limits
2.4-1A-linePI = 0.73(LL − 20)Silts plot below
2.4-3AASHTO group indexGI = (F − 35)[0.2 + 0.005(LL − 40)] + 0.01(F − 15)(PI − 10)Subgrade rating; negative terms = 0
2.4-4Saturated water contentwsat = γw/γd − 1/GsCollapse and liquefaction screening
2.4-5Capillary risehc = C′/(e D10), C′ = 0.0013–0.0065 ft·in.Order-of-magnitude estimate
2.4-6Undrained strength ratiosu/σ′v = S · OCRmPlastic silts; S ≈ 0.20–0.25, m ≈ 0.8
2.4-7Unsaturated shear strengthτ = c′ + (σ − ua)tanφ′ + (ua − uw)tanφbAbove water table; suction lost on wetting
2.4-8Compression indexCc = 0.009(LL − 10)NC soils; ±30%
2.4-9Compression indexCc = 0.30(e0 − 0.27)Inorganic silty soils
2.4-10Young's modulusEs (ksf) ≈ 6.3(N60 + 6)Silts, sandy silts; preliminary
2.4-13Critical gradientic = (Gs − 1)/(1 + e)Heave and piping
2.4-16SPT fines correction(N1)60,cs = α + β(N1)60 (Youd et al. 2001)Sand-like soils only
2.4-17CRR from SPTYoud et al. (2001)(N1)60,cs < 30
2.4-19CPT soil behavior type indexIc = √[(3.47 − log Qtn)2 + (log Fr + 1.22)2]Ic > 2.6 often clay-like
2.4-22Cyclic resistance, clay-likeCRR = 0.8 (su/σ′v) KαPI ≥ 7
2.4-24Gibbs collapse criterionwsat > LLLoess, loose silt
2.4-26Collapse settlementS = Σ CPi HiASTM D4546 at design stress

Other equations used with silts (Stefan and modified Berggren frost depth, Boussinesq stress, consolidation time) are collected in Appendix F.

← Previous · 2.0 The Underworld Chapter 2.3 — Track Substructure: Ballast, Subballast and Subgrade
Next · 2.0 The Underworld → Chapter 2.5 — Clays: Properties, Typical Values and Behavior