| Application | Main concerns | Guidance |
|---|---|---|
| Track subgrade | Pumping, frost heave, thaw weakening, low Mr | Drain the subgrade (ditches, underdrains); subballast or blanket layer that meets filter criteria or separation geotextile; frost protection depth per Chapter 7.3 Section 7.3.5; treat or replace silt where pumping recurs (Chapter 2.3, Section 2.3.4) |
| Embankment fill | Moisture control, erosion, softening when wetted | Use only above the high-water level unless stabilized; compact at optimum −2 to optimum; side slopes 2H:1V or flatter with prompt vegetation or erosion matting; bench into existing slopes; drain the core |
| Embankment over silt foundation | Undrained failure during fill placement (saturated loose silt); liquefaction; settlement | Check end-of-construction stability using undrained or partly drained strength; monitor pore pressure in staged construction; silt consolidates quickly, so stage periods are short |
| Cut slopes | Loss of suction, surface erosion, seepage sloughing | Analyze surficial stability with c′ = 0; crest interceptor ditch; toe drain or rock buttress at seepage faces; vegetate quickly; loess cuts per Section 2.4.10 |
| Behind retaining walls | Frost, drainage, low strength | Do not use silt as wall backfill; use free-draining granular backfill with a filter against the silt; for stabilization walls use driven soldier piles with lagging |
| Culverts and pipes | Piping along the pipe; erosion at the outlet | Filter diaphragm or filter collar around the pipe; compacted bedding of non-silt material; outlet riprap on a filter |
| Bridge approaches and abutments on floodplain silt | Scour, lateral spreading, settlement | Deep foundations through liquefiable silt; scour countermeasures; approach slabs or transition zones |
For hazard rating, silt conditions feed directly into the site conditions and instability blocks of the GHSR worksheet in Chapter 3.8: record the USCS group, water level, evidence of pumping or seepage, and whether the silt screens as liquefiable.