Silt is identified by particle size and by plasticity. Particle size alone is not enough, because a soil can be mostly silt-sized and still behave like clay if it contains active clay minerals.
| System | Fines (silt + clay) | Silt size | Clay size |
|---|---|---|---|
| USCS (ASTM D2487) | Passing No. 200 sieve (finer than 0.0029 in.) | Defined by plasticity, not size | Defined by plasticity, not size |
| AASHTO M 145 | Passing No. 200 sieve | 0.0029 to 0.00008 in. | Finer than 0.00008 in. |
| Older ASTM practice (D422, D653) | Passing No. 200 sieve | 0.0029 to 0.0002 in. | Finer than 0.0002 in. (older practice) |
Silt grains cannot be seen individually with the naked eye but feel gritty between the teeth, unlike clay, which feels smooth.
Under the USCS, fine-grained soil (50% or more passing the No. 200 sieve) is classified from its liquid limit (LL) and plasticity index (PI) on the Casagrande plasticity chart. The A-line separates clays (above) from silts (below):
Eq. 2.4-1 (A-line) and Eq. 2.4-2 (U-line, upper bound of natural soils)
| Group | Plasticity criteria (ASTM D2487) | Typical description |
|---|---|---|
| ML | LL < 50; PI < 4 or plots below the A-line | Silt, sandy silt, rock flour; non-plastic to low plasticity |
| CL-ML | LL < 50; 4 ≤ PI ≤ 7 and on or above the A-line | Silty clay; transitional, often behaves like silt |
| MH | LL ≥ 50; plots below the A-line | Elastic silt; micaceous or diatomaceous silt, some saprolites |
| OL / OH | Organic; LL (oven-dried) < 0.75 LL (not dried) | Organic silt; high compressibility |
| SM (with high fines) | Fines 12% to 49%, fines classify ML or MH | Silty sand; silt-controlled drainage, frost and liquefaction behavior |
The visual-manual tests separate silt from clay in the field and should be recorded on every boring log where fine-grained soil is sampled:
| Test | Silt (ML) | Elastic silt (MH) | Lean clay (CL) |
|---|---|---|---|
| Dilatancy (shake a wet pat) | Rapid: water appears and disappears quickly | None to slow | None to slow |
| Dry strength (crush a dried ball) | None to low; powders easily | Low to medium | Medium to high |
| Toughness (roll a thread near the plastic limit) | Low; thread crumbles; cannot be re-rolled | Low to medium | Medium |
| Feel | Gritty, floury when dry; dries quickly on the hands | Smooth; may feel slick if micaceous | Smooth, sticky |
Silts fall in AASHTO groups A-4 (LL ≤ 40, PI ≤ 10) and A-5 (LL ≥ 41, PI ≤ 10), both with more than 35% passing the No. 200 sieve. The group index rates the soil as a subgrade (higher is worse):
Eq. 2.4-3
Where:
For details of grain-size and Atterberg limit testing, see Chapter 2.2, Sections 2.2.2 to 2.2.5.