↑ Parent Menu⌂ Main Menu
← Chapter 2.4 Silts: Properties, Typical Values and Liquefaction
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.4.17 Practice Questions

Silt sits between sand and clay: too fine to drain freely, too coarse and too weakly plastic to hold together when wet. That combination makes it the soil most often behind track pumping, frost heave, piping, sloughing cut slopes, collapsing loess and liquefaction of fine-grained ground.
Author: Daniel P. Colwell
2.4.17 Practice Questions
Each question is worked in the same five parts as the examples. Try it from the Given and Required before opening the steps.
Question 2.4-1: Classify a Low-Plasticity Silt

Problem Statement

A Class I railroad main line has a history of soft spots and mud pumping over a silty subgrade. A sample from the subgrade has the liquid limit, plasticity index and fines content shown. The engineer must classify the soil in the USCS and AASHTO systems and comment on it as a track subgrade.

102030405060708090102030405060A-lineU-lineCLCHMLMH or OHLL = 50Liquid limit, LL (%)Plasticity index, PI (%)Subgrade silt: LL 42, PI 10USCS = ?GivenLL = 42PI = 10F = 80% passing No. 200RequiredUSCS groupAASHTO group and GIBlack = given; red = required
Given and required for Question 2.4-1.

Given

VariableValueDescription
LL42Liquid limit
PI10Plasticity index
F80%Passing No. 200

Required

  • USCS group
  • AASHTO group and group index

Equations

  1. Eq. 2.4-1: PIA = 0.73 (LL − 20) — A-line
  2. Eq. 2.2-10: GI = (F − 35)[0.2 + 0.005(LL − 40)] + 0.01(F − 15)(PI − 10) — group index

Steps

Step 1 · A-line
0.73 (42 − 20) = 16.1; PI = 10 < 16.1; LL < 50
ML
↓
Step 2 · AASHTO group
F > 35%; LL = 42 ≥ 41; PI = 10 ≤ 10
A-5
↓
Step 3 · GI
45 × [0.2 + 0.005 × 2] + 0.01 × 65 × 0 = 45 × 0.21
GI = 9.45, reported as 9
Spot check: The second term is zero because PI − 10 = 0.
↓
Solution
ML; A-5(9).

Solution

USCS: ML. AASHTO: A-5 with GI = 9, written A-5(9).

A-5 is the AASHTO group for silty soils with a high liquid limit: compressible and poor as subgrade. Note that the soil is a silt in both systems even though its PI is 10; the A-line, not the PI alone, separates silt from clay.

Question 2.4-2: Consolidation Settlement and Time for a Silt Layer

Problem Statement

A new railroad embankment will be built over 10 ft of normally consolidated silt drained at top and bottom. The fill will add the stress shown at mid-layer. The railroad wants to know how much settlement to expect and whether it will be complete before track is laid. The engineer must estimate the settlement and the time to 90% consolidation.

Silts consolidate much faster than clays, so most of the settlement can finish during construction. The question estimates both how much and how fast, with two correlations for the compression index to show the range.

New fill: Δσ = 800 psfDrainage (top)NC silt: LL 38, e0 = 0.85, cv = 2 ft²/dayσ′0 = 1,000 psf at mid-layerDrainage (bottom)H = 10 ftS = ? t90 = ?GivenH = 10 ft, drained top and bottomLL = 38 (Cc from LL)e0 = 0.85; cv = 2 ft²/dayσ′0 = 1,000 psf; Δσ = 800 psfRequiredConsolidation settlement STime to 90%, t90Black = given; red = required
Given and required for Question 2.4-2.

Given

VariableValueDescription
H10 ft, drained top and bottomNormally consolidated silt
LL38Liquid limit
e00.85Initial void ratio
cv2 ft²/dayCoefficient of consolidation
σ′01,000 psfEffective stress at mid-layer
Δσ800 psfStress increase from new fill

Required

  • Consolidation settlement S
  • Time to 90% consolidation t90

Equations

  1. Eq. 2.4-8: Cc = 0.009 (LL − 10) — Terzaghi and Peck
  2. Eq. 2.4-9: Cc = 0.30 (e0 − 0.27) — Hough, inorganic silty soils
  3. Eq. 3: S = [Cc H / (1 + e0)] log[(σ′0 + Δσ)/σ′0] — normally consolidated
  4. Eq. 2.4-12: t = Tv Hdr² / cv; T90 = 0.848

Steps

Step 1 · Cc (Eq. 2.4-8 and 2.4-9)
0.009 × 28; 0.30 × 0.58
Cc = 0.252 and 0.174
↓
Step 2 · Settlement (Eq. 3)
[0.252 × 10 / 1.85] log(1,800/1,000) = 1.362 × 0.255
S = 0.35 ft = 4.2 in. (2.9 in. with Hough’s Cc)
Spot check: 4.2 × 0.174/0.252 = 2.9 in.
↓
Step 3 · Time to 90% (Eq. 2.4-12)
Hdr = 5 ft; 0.848 × 25 / 2
t90 = 10.6 days
↓
Solution
S = 2.9 to 4.2 in.; t90 = 10.6 days.

Solution

Settlement of about 2.9 to 4.2 in., 90% complete in about 11 days.

Most of the settlement will happen while the fill is being placed, which is the usual case for silts and the opposite of soft clays. The two correlations differ by about 30%; a consolidation test would narrow the range of Cc if the settlement matters to the design.

Question 2.4-3: Piping at a Culvert Outlet in Silt

Problem Statement

Water is exiting through silt at the outlet of a culvert under a Class I railroad embankment, and a flow net gives the exit gradient shown. The railroad wants to know whether the outlet is at risk of piping. The engineer must compute the critical gradient and the factor of safety against piping and recommend any protection.

Silts are among the soils most prone to piping because they are fine enough to move and too weak in cohesion to resist. The check compares the exit gradient from a flow net with the critical gradient at which the soil becomes quick.

Embankment and trackCulvertExit gradient i = 0.35Silt: Gs = 2.70, e = 0.80ic = ? FS = ?GivenGs = 2.70; e = 0.80Exit gradient 0.35 (flow net)Target FS = 3 (unprotected silt)RequiredCritical gradientFS against pipingBlack = given; red = required
Given and required for Question 2.4-3.

Given

VariableValueDescription
Gs2.70Specific gravity
e0.80Void ratio
iexit0.35Exit gradient from the flow net
Target FS3For an unprotected silt exit

Required

  • Critical gradient and factor of safety against piping

Equations

  1. Eq. 2.4-13: ic = (Gs − 1)/(1 + e) — critical hydraulic gradient
  2. Eq. 2: FS = ic / iexit

Steps

Step 1 · Critical gradient (Eq. 2.4-13)
1.70 / 1.80
ic = 0.94
↓
Step 2 · FS (Eq. 2)
0.94 / 0.35
FS = 2.7 < 3
↓
Solution
FS = 2.7, below the target of 3: protect the outlet.

Solution

FS = 2.7, below the target of 3 for an unprotected silt exit.

Provide a filter at the outlet (Section 2.4.7, Category 1 or 2 depending on the fines content) and outlet protection. The filter lets water leave while holding the silt in place, which is what removes the piping risk; riprap alone would not.

Question 2.4-4: CPT-Based Liquefaction Resistance of a Sandy Silt

Problem Statement

A piezocone sounding was made through a saturated, non-plastic sandy silt beneath a Class I railroad main line in a seismic area. The normalized cone resistance and friction ratio are shown. The engineer must compute the soil behavior type index, the clean-sand equivalent resistance and the cyclic resistance ratio for the liquefaction assessment.

The CPT method of Robertson and Wride converts the normalized tip resistance of a silty soil to a clean-sand equivalent through the soil behavior type index Ic. In silts the correction factor Kc is large, which is why the question asks for it explicitly.

0.11101101001000Qtn = 35, Fr = 2.5%Ic, Qtn,cs, CRR7.5 = ?Normalized friction ratio Fr (%)QtnSoil behavior type chart (log–log)GivenQtn = 35Fr = 2.5%Saturated, non-plastic sandy siltRequiredIcQtn,csCRR7.5Black = given; red = required
Given and required for Question 2.4-4.

Given

VariableValueDescription
Qtn35Normalized cone resistance
Fr2.5%Normalized friction ratio
SoilSaturated sandy silt, non-plastic (confirmed by samples)

Required

  • Ic, Qtn,cs and CRR7.5

Equations

  1. Eq. 2.4-19: Ic = [(3.47 − log Qtn)² + (log Fr + 1.22)²]0.5
  2. Eq. 2.4-20: Kc = −0.403 Ic4 + 5.581 Ic3 − 21.63 Ic2 + 33.75 Ic − 17.88; Qtn,cs = Kc Qtn — for Ic > 1.64
  3. Eq. 2.4-21: CRR7.5 = 93 (Qtn,cs/1,000)3 + 0.08 — for 50 ≤ Qtn,cs < 160

Steps

Step 1 · Ic (Eq. 2.4-19)
3.47 − 1.544 = 1.926; 0.398 + 1.22 = 1.618; √(3.709 + 2.618)
Ic = 2.52: sand mixture, sand-like
↓
Step 2 · Kc and Qtn,cs (Eq. 2.4-20)
−16.25 + 89.31 − 137.36 + 85.05 − 17.88 = 2.85; 2.85 × 35
Kc = 2.85; Qtn,cs = 100
Spot check: Ic2 = 6.35, Ic3 = 16.00, Ic4 = 40.3.
↓
Step 3 · CRR7.5 (Eq. 2.4-21)
93 × 0.1003 + 0.08 = 0.093 + 0.08
CRR7.5 = 0.17
↓
Solution
Ic = 2.52; Qtn,cs = 100; CRR7.5 = 0.17.

Solution

Ic = 2.52, Qtn,cs = 100 and CRR7.5 = 0.17.

The correction nearly triples the tip resistance, so in silts the result depends heavily on Ic, which in turn depends on the friction ratio. A small error in Fr moves CRR a lot. Confirm Ic against samples, as was done here, before relying on the result.

← Previous · 2.0 The Underworld Chapter 2.3 — Track Substructure: Ballast, Subballast and Subgrade
Next · 2.0 The Underworld → Chapter 2.5 — Clays: Properties, Typical Values and Behavior