Silt is the most frost-susceptible soil, because it combines strong capillary suction with enough permeability to feed growing ice lenses. The mechanism, field signs and remedies are covered in Chapter 3.8, Section 3.8.8; frost depth calculation and frost design of pavements are in Chapter 7.3, Section 7.3.5. This section gives the classification criteria.
| Frost group | Soil type | Percent finer than 0.0008 in. by weight | Typical USCS groups |
|---|---|---|---|
| NFS | (a) Gravels; (b) sands | 0–1.5; 0–3 | GW, GP, SW, SP |
| PFS (possibly) | (a) Gravels; (b) sands | 1.5–3; 3–10 | GW, GP, SW, SP |
| F1 | Gravelly soils | 3–10 | GW, GP, GW-GM, GP-GM |
| F2 | (a) Gravelly soils; (b) sands | 10–20; 3–15 | GM, GW-GM, GP-GM; SW, SP, SM, SW-SM, SP-SM |
| F3 | (a) Gravelly soils; (b) sands, except very fine silty sands; (c) clays, PI > 12 | > 20; > 15; — | GM, GC; SM, SC; CL, CH |
| F4 | (a) All silts; (b) very fine silty sands; (c) clays, PI < 12; (d) varved clays and other fine-grained, banded sediments | —; > 15; —; — | ML, MH; SM; CL, CL-ML; CL and ML, CL, ML and SM, CL, CH and ML |
0.0008 in. is the 0.02 mm size used in the Casagrande criterion. Frost susceptibility increases from F1 to F4. Group F4 soils show the highest heave rates and the greatest loss of strength on thawing.
When ice lenses melt in spring, the thawed silt above the still-frozen layer cannot drain downward, its water content rises above the liquid limit locally, and its strength and resilient modulus fall. Design practice for F4 silts is to reduce the subgrade modulus by 50% to 75% during the thaw period, or to use the USACE reduced-subgrade-strength method. Under traffic, the thawed saturated silt can liquefy and pump; this "silt liquefaction" in spring is a cyclic-loading failure of the same family as seismic liquefaction (Section 2.4.9), and is the reason spring slow orders are common on silt subgrades.