↑ Parent Menu⌂ Main Menu
← Chapter 2.4 Silts: Properties, Typical Values and Liquefaction
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.4.6 Compaction, Moisture Sensitivity and Stabilization

Silt sits between sand and clay: too fine to drain freely, too coarse and too weakly plastic to hold together when wet. That combination makes it the soil most often behind track pumping, frost heave, piping, sloughing cut slopes, collapsing loess and liquefaction of fine-grained ground.
Author: Daniel P. Colwell
2.4.6 Compaction, Moisture Sensitivity and Stabilization

Silt has a steep, narrow compaction curve. A change of 2 to 3 percentage points in water content can take it from firm and compactable to pumping and rutting under equipment. Silt also dries slowly in humid weather and rewets quickly, so moisture control, not compactive effort, usually governs.

Table 2.4-8: Typical Compaction and Subgrade Values for Silts
ParameterMLMHCL-MLLoess
Standard Proctor max. dry unit weight (pcf, ASTM D698)95–11080–100105–11895–108
Standard Proctor optimum water content (%)14–2222–3511–1614–19
Modified Proctor max. dry unit weight (pcf, ASTM D1557)105–11890–108112–125105–115
Workable water content window−3 to +1 of optimum−2 to +2 of optimum−2 to +2 of optimum−3 to +1 of optimum
Soaked CBR (ASTM D1883)3–102–63–83–8
Resilient modulus, Mr (psi)4,000–12,0003,000–7,0004,000–10,0004,000–10,000
Subgrade rating (AASHTO)Fair to poorPoorFair to poorFair to poor

Resilient modulus can be estimated from CBR with Mr = 2,555 CBR0.64 (MEPDG); see Chapter 7.3, Section 7.3.2. Silt Mr drops sharply with rising water content and during spring thaw.

Compaction guidance

  • Compact silt at or slightly dry of optimum (optimum −2 to optimum). Silt compacted wet of optimum pumps under rollers and cannot reach density; silt compacted far dry of optimum collapses and loses strength when it later wets up.
  • Specify both a minimum relative compaction (typically 95% of standard Proctor for embankment and 95% of modified Proctor for the top 12 in. of subgrade) and a moisture range.
  • Use smooth-drum or pad-foot rollers in thin lifts (6 to 8 in. loose). Heavy vibratory compaction of saturated silt pumps water to the surface.
  • Seal the surface at the end of each day (smooth-drum roll and crown to drain) and do not work silt during or right after rain.
  • Proof-roll subgrades; a loaded tandem-axle truck that leaves ruts more than about 1 in. deep marks soft spots for undercut or treatment.

Chemical stabilization

Low-plasticity silt has too little clay to react well with lime alone. Cement, or lime with fly ash, works better:

Table 2.4-9: Stabilizer Selection for Silts
Silt typePreferred stabilizerTypical dosage (by dry weight)Check
ML, CL-ML (PI < 10)Portland cement6–12%Unconfined strength (ASTM D1633, withdrawn 2026) 7-day ≥ 150–300 psi for base; wet-dry and freeze-thaw durability (ASTM D559, D560)
ML/MH with PI 10–20Lime + fly ash, or cementLime 3–5% + fly ash 10–15%, or cement 8–12%Sulfate content (ASTM D4327) before using lime or cement; heave risk above about 3,000 ppm
MH (PI > 20)Lime4–8% (by lime demand, ASTM D6276)Strength gain and PI reduction
Wet silt for working platformQuicklime or cement kiln dust (drying)2–5%Water content reduction to the workable window

See Chapter 7.2, Section 7.2.7 for design and construction of chemical stabilization.

← Previous · 2.0 The Underworld Chapter 2.3 — Track Substructure: Ballast, Subballast and Subgrade
Next · 2.0 The Underworld → Chapter 2.5 — Clays: Properties, Typical Values and Behavior