Silt strength depends heavily on drainage. Non-plastic silt drains slowly enough to build pore pressure under rapid loading but fast enough that it partly drains in a CPT sounding or a lab test. Choose the drainage condition for each analysis deliberately and state it.
| Parameter | ML | MH | CL-ML | Notes |
|---|---|---|---|---|
| Drained friction angle, φ′ (deg) | 28–35 | 23–30 | 26–32 | Higher for angular rock flour and dense silt; lower for micaceous silt |
| Effective cohesion, c′ (psf) | 0–100 | 0–200 | 0–150 | Take c′ = 0 for long-term analysis of non-plastic silt unless testing shows otherwise |
| Residual friction angle, φ′r (deg) | 26–32 | 15–25 | 20–28 | Little drop from peak in non-plastic silt; larger drop as PI and mica content rise |
| Undrained strength ratio, su/σ′v (normally consolidated) | 0.20–0.30 | 0.22–0.30 | 0.20–0.28 | Use SHANSEP (Eq. 2.4-6) for overconsolidated silt |
| Sensitivity, St | 1–4 | 2–8 | 2–8 | Glacial lake and marine silty clays in eastern Canada can exceed 30 (quick) |
| Suction friction angle, φb (deg) | 15–25 | 10–20 | 10–20 | Strength gain from matric suction above the water table |
Ranges compiled from Kulhawy and Mayne (1990), Terzaghi, Peck and Mesri (1996) and Fredlund and Rahardjo (1993).
Eq. 2.4-6 (Ladd and Foott 1974)
Where:
Above the water table, silt gains apparent cohesion from negative pore pressure (suction). The extended Mohr-Coulomb criterion is:
Eq. 2.4-7 (Fredlund and Rahardjo 1993)
Where:
A matric suction of only 300 psf with φb = 18° adds about 100 psf of apparent cohesion, which is enough to hold a silt cut face at a steep angle. A wet season removes it. This is why silt and loess cuts that stood for years slough after prolonged rain, and why surficial failures in silt cuts should be analyzed with c′ = 0 and the suction term set to zero (Chapter 6.3, Section 6.3.6).