Fine-grained soils were once assumed not to liquefy. Experience in the 1999 Kocaeli (Turkey) and Chi-Chi (Taiwan) earthquakes, where low-plasticity silts liquefied extensively, changed that view. Current practice first asks whether a silt will behave like a sand (liquefaction: rapid loss of strength and large strains once excess pore pressure approaches the effective stress) or like a clay (cyclic softening: gradual build-up of strain without full loss of strength), and then applies the matching procedure. Chapter 6.5, Sections 6.5.4 to 6.5.7 give the full triggering and consequence procedures; this section covers what is specific to silts.
Three screening criteria are in common use. Apply them to samples from below the design water table, using water content measured on undisturbed or carefully handled samples.
| Method | Susceptible (sand-like) | Transitional | Not susceptible (clay-like) | Comment |
|---|---|---|---|---|
| Boulanger and Idriss (2006) | PI < 7 | PI about 3–8 for CL-ML | PI ≥ 7 | Recommended default; evaluate clay-like soils for cyclic softening (Section 2.4.9.4) |
| Bray and Sancio (2006) | w/LL ≥ 0.85 and PI ≤ 12 | w/LL ≥ 0.80 and 12 < PI ≤ 18 (moderately susceptible; test) | PI > 18 (at low effective stress) | Based on cyclic tests of Adapazari silts; uses natural water content |
| Modified Chinese criteria (Wang 1979; Seed and Idriss 1982) | Clay fraction (finer than 0.0002 in.) ≤ 15%, LL ≤ 35 and w ≥ 0.9 LL | — | Any one condition not met | No longer recommended alone; misclassified liquefiable silts in 1999 earthquakes |
Where screening results conflict, take the more susceptible result or run cyclic laboratory tests (cyclic direct simple shear or cyclic triaxial) on high-quality samples.
For sand-like silts and silty sands, use the simplified procedure of Chapter 6.5, Section 6.5.5 with the fines correction. The cyclic stress ratio is:
Eq. 2.4-15 (rd = 1.0 − 0.00765z for z ≤ 29.5 ft, z in feet)
The fines content correction converts the normalized blow count to a clean-sand equivalent:
Eq. 2.4-16 (Youd et al. 2001, after Idriss and Seed; FC in percent)
The correction grows with fines content up to FC = 35% and is fixed above it: a soil with FC ≥ 35% and (N 1 ) 60 = 12 gains about 7 blows. The correction reflects higher cyclic resistance at the same blow count, not higher density, so do not apply it to soils classified as clay-like in Step 1.
Eq. 2.4-17 (Youd et al. 2001; valid for (N1)60,cs < 30) and Eq. 2.4-18
Use MSF and Kσ from Chapter 6.5, Section 6.5.4. Keep the procedure consistent: Eqs. 2.4-15 to 2.4-17 are the Youd et al. (2001) set. Do not mix them with the Idriss and Boulanger (2008) fines correction, CRR curve, MSF or r d in final design.
The CPT is better suited to silty ground than the SPT because it detects thin silt seams and measures pore pressure. The soil behavior type index is:
Eq. 2.4-19 (Robertson and Wride 1998; Fr in percent)
| Ic | Soil behavior type | Liquefaction screening |
|---|---|---|
| < 2.05 | Sands: clean sand to silty sand | Evaluate with CPT procedure |
| 2.05–2.60 | Sand mixtures: silty sand to sandy silt | Evaluate with CPT procedure and fines correction |
| 2.60–2.95 | Silt mixtures: clayey silt to silty clay | Transitional; confirm with samples (PI, w/LL). Many are clay-like |
| > 2.95 | Clays | Generally clay-like; check cyclic softening |
For sand-like soils, the equivalent clean-sand normalized tip resistance and the cyclic resistance ratio are:
Eq. 2.4-20 and Eq. 2.4-21 (Robertson and Wride 1998)
Kc grows rapidly above Ic = 2.4 (it is about 2.8 at Ic = 2.5), so the result for silty soils is very sensitive to Ic. Calibrate Ic against samples from adjacent borings before relying on CPT-only results in silt.
For silts that screen as clay-like (PI ≥ 7), Boulanger and Idriss (2007) relate cyclic resistance to undrained strength:
Eq. 2.4-22 and Eq. 2.4-23 (MSFclay ≤ 1.13)
Where:
Clay-like silts with FS below about 1.0 to 1.2 can develop significant shear strain and settlement, and under sloping ground such as embankments they can move permanently downslope. Evaluate these cases with a Newmark sliding-block or deformation analysis (Chapter 6.5, Section 6.5.8) using a reduced (cyclically softened) strength.
Mitigation of liquefiable silts is harder than for clean sand: vibro-compaction does not densify soils with more than about 15% to 20% fines, and stone columns in silt need wick drains or rely on reinforcement rather than densification. Deep soil mixing, jet grouting, compaction grouting and drainage are the usual options (Chapter 7.2, Section 7.2.5).