↑ Parent Menu⌂ Main Menu
← Chapter 2.4 Silts: Properties, Typical Values and Liquefaction
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.4.1 Background and Railroad Context

Silt sits between sand and clay: too fine to drain freely, too coarse and too weakly plastic to hold together when wet. That combination makes it the soil most often behind track pumping, frost heave, piping, sloughing cut slopes, collapsing loess and liquefaction of fine-grained ground.
Author: Daniel P. Colwell
2.4.1 Background and Railroad Context

Railroads cross silt everywhere: on river floodplains and terraces where lines follow valleys, on glacial lake beds, on wind-blown loess uplands and bluffs, and in the residual soils of the Piedmont. Many older embankments were built from the nearest cut, so the fill under the ballast is often silt as well.

Table 2.4-1: Where Silts Are Found on Railroad Lines
OriginTypical settingCharacteristic behavior
Alluvial (floodplain, terrace)Valley alignments, bridge approaches, river crossingsLoose, saturated and layered with sand and clay; liquefiable in seismic regions; scour and piping at bridges and culverts
Lacustrine and glacial rock flourGlacial lake plains of the Great Lakes, prairies, northern New England and eastern CanadaVarved silt and clay; very frost-susceptible; low strength when disturbed; can be sensitive
Loess (wind-blown)Bluffs along the Mississippi and Missouri valleys, Iowa, Nebraska, Kansas, the PalouseLow dry density; stands in near-vertical cuts while dry; collapses, erodes and pipes when wetted
Residual (saprolite)Piedmont and Blue Ridge cuts and fillsMicaceous ML/MH; high void ratio, springy and hard to compact; erodible; strength declines as weathering increases
Fill derived from siltOlder embankments and subgradesVariable density; pumps under traffic when wet; frost heave; surficial sloughing of side slopes
Mine tailings and dredge spoilIndustrial spurs, port and yard expansionsVery loose, saturated; high liquefaction and flow-slide potential

On an operating railroad, silt problems usually show up first in the track, not in a boring log: soft spots and pumping ties, a winter heave that returns each year, sloughing on a cut face after rain, a sinkhole over a culvert, or a bridge approach that settles after a flood. Chapter 3.8, Section 3.8.13 sets out how to trace a symptom back to its mechanism. This chapter gives the soil-specific data to confirm whether silt is the cause.

← Previous · 2.0 The Underworld Chapter 2.3 — Track Substructure: Ballast, Subballast and Subgrade
Next · 2.0 The Underworld → Chapter 2.5 — Clays: Properties, Typical Values and Behavior