1.0.2 How the Manual Is Organized

About this manual and how it is organized.
Authors: Daniel P. Colwell and Mario Ruel
1.0.2 How the Manual Is Organized
SectionTitleScopeChapters
1.0IntroductionAbout this manual and the risk framework that governs the rest of itChapter 1.0 — Manual Overview
Chapter 1.1 — Introduction to Railway Ground Hazard Risk Management
2.0The UnderworldTrack foundation, failure mechanisms, soil and rock, track substructure, problem soils and groundwaterChapter 2.1 — Track Foundation Elements
Failure mechanisms and triggers (Chapter 3.8, Sections 3.8.1–3.8.17)
Chapter 2.2 — Soil and Rock Classification
Chapter 2.3 — Track Substructure: Ballast, Subballast and Subgrade
Chapter 2.4 — Silts: Properties, Typical Values and Liquefaction
Chapter 2.5 — Clays: Properties, Typical Values and Behavior
Chapter 2.6 — Peats and Organic Soils: Properties, Typical Values and Behavior
Chapter 2.7 — Rock and Sand: Properties, Typical Values and Behavior
Chapter 2.8 — Groundwater Characterization and Seepage
3.0Risk ManagementScoping, desktop study, drilling scope, site review, site conditions, access, cost, risk ratings and risk assessmentChapter 3.1 — Scoping Proposals
Chapter 3.2 — Desktop Study
Chapter 3.3 — Drilling Scope
Chapter 3.4 — Site Review and Reconnaissance
Chapter 3.5 — Site Conditions
Chapter 3.6 — Site Accessibility Study
Chapter 3.7 — Cost Estimates
Chapter 3.8 — Risk Ratings and Ground Hazard Risk Assessment
Chapter 3.8 — Risk Ratings and Ground Hazard Risk Assessment
Chapter 3.9 — Geotechnical Investigation Planning and Scope
4.0Subsurface ExplorationBorings and samplingChapter 4.1 — Borings and Sampling
5.0TestingIn situ testing, laboratory testing, and construction monitoring and field testingChapter 5.1 — In Situ Testing
Chapter 5.2 — Laboratory Testing Program
Chapter 5.3 — Construction Monitoring and Field Testing
6.0AnalysisBearing capacity, settlement, slope stability, infiltration and seepage, and seismic hazardChapter 6.1 — Foundation Engineering: Bearing Capacity
Chapter 6.2 — Settlement Analysis
Chapter 6.3 — Slope Stability Analysis
Chapter 6.4 — Infiltration and Seepage
Chapter 6.5 — Seismic Hazard and Liquefaction
7.0DesignRetaining structures, ground improvement and pavement subgradeChapter 7.1 — Retaining Structures
Chapter 7.2 — Ground Improvement Methods
Chapter 7.3 — Pavement Subgrade Evaluation
Ground Improvement Technology Library — Chapter 7.2, Section 7.2.16
8.0ReportingExploration versus investigation, change orders, memorandums and the geotechnical reportChapter 8.1 — Exploration Versus Investigation
Chapter 8.2 — Change Orders
Chapter 8.3 — Memorandums
Chapter 8.4 — Geotechnical Report Preparation
App.AppendicesTemplates, special provisions, typical soil properties and analytical equationsAppendices
Appendix D — Typical Soil Properties from Blow Counts, Moisture Content and Liquid Limit
Appendix F — Analytical Equations

Where the Geotechnology for Railroaders course modules are used in this manual

The two-day Geotechnology for Railroaders course (Modules 1–8) is the field-training companion to this manual. Its concepts, case histories, field photographs and job-aid figures are cited in the chapters below. Use the course for crews and inspectors, and this manual for the engineering basis behind it.

Table 1.0-2. Course module to manual chapter crosswalk
Course moduleWhere it appears in this manual
1 — Risk Management of Geo-HazardsChapter 1.1 (risk equation, classification, case histories, stabilization program)
2 — Geology and Soil EngineeringChapters 3.9, 4.1, 2.2, 5.2 and 3.8 (landforms, sampling, field identification, subgrade strength by feel)
3 — Track Substructure: Ballast and Sub BallastChapters 2.3 and 2.1 (ballast functions, fouling, undercutting, sub ballast, bridge approaches)
4 — Track DrainageChapters 2.3, 2.1 and 2.8 (cardinal rules, ditches, subdrains, culvert inspection)
5 — Slides and InstabilitiesChapters 3.8 and 6.3 (downhill and uphill slide categories, the four don’ts, signs of instability)
6.1 — Slope StabilizationChapters 6.3 and 7.1 (berms, realignment, driven and gravity walls, soil nailing)
6.2 — Subgrade StabilizationChapters 6.1, 5.3 and 7.2 (geosynthetics, HMA underlayment, grouting, EPS, screw piles)
6.3 — Scour and ErosionChapter 3.8 (scour mechanisms, countermeasures)
6.4 — Rock FallsChapters 3.8 and 6.3 (rockfall strategies, incident reporting)
6.5 — Beaver DamsChapter 3.8 (BAHA program, uphill dams, rapid drawdown)
6.6 / 7.1 — Winter Problems, Spring ThawChapters 2.3, 3.8 and 6.3 (frost heave, spring silt liquefaction, rapid drawdown)
7.2 / 7.3 — Extreme Weather, EarthquakesChapters 3.8 and 6.5 (event declaration, precipitation indices, seismic response criteria)

After Geotechnology for Railroaders Program, Module 1; course menu. Full reference under Supplemental References.

Next · 1.0 Introduction → Chapter 1.1 — Introduction to Railway Ground Hazard Risk Management