Many values in railway geotechnical work are estimated from empirical equations: SPT and CPT correlations for strength and stiffness, index-property correlations for compressibility and permeability, rock-mass ratings, and landslide runout and rainfall-threshold relations. The manual collects 60 of them in the Empirical Equations & Correlations reference, each with its formula, original source, the data it was fitted to, and the constraints on its use.
Every equation is a statistical fit to a specific data set. Use it only within the stated materials and ranges, prefer site-specific calibration, and confirm coefficients against the cited original before relying on a result for design.
Note required when an equation is used. Wherever a correlated value appears — a calculation, a boring log, a design-parameter table, a report or a GHRM assessment — record with it:
Each chapter has an Empirical Equations — Use and Limitations card listing the equations it uses, and an Empirical equation note box closes each section that refers to one. The Geotechnical Analysis Suite workflow adds the same note wherever it uses a correlation (preliminary anticipated results, assumed design parameters, the report).
| ID | Equation | Family | Used in (or applies to) |
|---|---|---|---|
| IS-01 | SPT energy & procedure correction | In-situ tests | Appendices; Chapter 3.9; Chapter 4.1; Chapter 6.1; Chapter 6.5; Chapter 5.3; Chapter 8.4 |
| IS-02 | SPT overburden normalization (sands) | In-situ tests | Appendices (applies); Chapter 3.9 (applies); Chapter 4.1; Chapter 6.5; Chapter 8.4 |
| IS-03 | Relative density of sand from SPT | In-situ tests | Chapter 4.1 (applies); Chapter 7.2 (applies) |
| IS-04 | Friction angle of sand from SPT (Schmertmann form) | In-situ tests | Chapter 6.1 (applies); Chapter 7.1 (applies) |
| IS-05 | Friction angle of sand from SPT (Peck–Hanson–Thornburn) | In-situ tests | Chapter 4.1 (applies); Chapter 6.1 (applies); Chapter 7.1 (applies) |
| IS-06 | Friction angle of sand from SPT (Hatanaka & Uchida) | In-situ tests | Chapter 6.1 (applies) |
| IS-07 | Undrained shear strength of clay from SPT | In-situ tests | Chapter 4.1 (applies); Chapter 6.1 (applies); Chapter 6.3 (applies); Chapter 6.5; Chapter 2.3 (applies); Chapter 8.4; Chapter 2.1 (applies) |
| IS-08 | Drained Young's modulus of sand from SPT | In-situ tests | Chapter 6.2 (applies) |
| IS-09 | Shear-wave velocity from SPT | In-situ tests | Chapter 6.5 (applies) |
| IS-10 | OCR of clay from SPT | In-situ tests | reference only |
| IS-11 | Cyclic resistance ratio of sand from SPT | In-situ tests | Chapter 6.5 |
| IS-12 | Corrected cone resistance | In-situ tests | Chapter 5.1; Chapter 6.5; Chapter 5.3 (applies) |
| IS-13 | Soil behaviour type index (normalized) | In-situ tests | Chapter 5.1 (applies); Chapter 6.5 |
| IS-14 | Undrained shear strength from CPT | In-situ tests | Chapter 5.1; Chapter 6.1 (applies); Chapter 6.3 (applies); Chapter 7.2 |
| IS-15 | Friction angle of sand from CPT | In-situ tests | Chapter 5.1 (applies); Chapter 6.1 (applies) |
| IS-16 | Relative density of sand from CPT | In-situ tests | Chapter 5.1 (applies); Chapter 7.2 (applies) |
| IS-17 | Preconsolidation stress / OCR from CPT | In-situ tests | Chapter 5.1 (applies); Chapter 6.2; Chapter 7.2; Chapter 5.3 (applies) |
| IS-18 | Shear-wave velocity from CPT | In-situ tests | Chapter 5.1; Chapter 6.5; Chapter 2.3 |
| IS-19 | Constrained modulus from CPT | In-situ tests | Chapter 5.1 (applies); Chapter 6.2 (applies); Chapter 7.2 (applies) |
| IS-20 | Hydraulic conductivity from CPT | In-situ tests | Chapter 5.1 (applies); Chapter 2.8 (applies); Chapter 7.2 |
| IS-21 | Soil unit weight from CPT | In-situ tests | Chapter 5.1 (applies); Chapter 7.3 (applies) |
| IS-22 | Cyclic resistance ratio of sand from CPT | In-situ tests | Chapter 6.5 |
| IS-23 | Flat dilatometer (DMT) intermediate parameters | In-situ tests | Chapter 5.1 |
| IS-24 | OCR, K₀ and Sᵤ of clay from DMT | In-situ tests | Chapter 5.1 |
| IS-25 | Field vane strength correction | In-situ tests | Chapter 5.1; Chapter 2.2; Chapter 6.3 |
| IX-01 | Compression index from liquid limit (undisturbed) | Index properties | Chapter 3.9 (applies); Chapter 2.2 (applies); Chapter 6.2 (applies); Chapter 5.2 (applies) |
| IX-02 | Compression index from liquid limit (remolded) | Index properties | Chapter 6.2 (applies); Chapter 5.2 (applies) |
| IX-03 | Compression index from void ratio | Index properties | Chapter 6.2 (applies); Chapter 5.2 (applies) |
| IX-04 | Compression index from plasticity index | Index properties | Chapter 2.2 (applies); Chapter 6.2 (applies); Chapter 5.2 (applies) |
| IX-05 | Secondary compression ratio | Index properties | Chapter 6.2; Chapter 2.3 (applies); Chapter 5.3 (applies); Chapter 5.2 (applies); Chapter 2.1 |
| IX-06 | Normalized undrained strength from plasticity | Index properties | Chapter 6.3 (applies); Chapter 5.2 (applies) |
| IX-07 | SHANSEP undrained strength ratio | Index properties | Chapter 6.3 (applies) |
| IX-08 | Friction angle of NC clay from plasticity | Index properties | Chapter 6.3 (applies); Chapter 7.1 (applies); Chapter 5.2 (applies) |
| IX-09 | At-rest earth pressure coefficient | Index properties | Chapter 5.1; Chapter 7.1; Chapter 2.1 (applies) |
| IX-10 | Undrained strength from liquidity index | Index properties | Chapter 2.2; Chapter 7.3 (applies); Chapter 5.2 (applies) |
| IX-11 | Hazen hydraulic conductivity | Index properties | Chapter 2.8 (applies); Chapter 7.2 (applies); Chapter 5.2 (applies) |
| IX-12 | Chapuis hydraulic conductivity | Index properties | Chapter 2.8 (applies) |
| IX-13 | Small-strain shear modulus (Hardin) | Index properties | Chapter 5.1; Chapter 6.5 (applies); Chapter 2.3 (applies); Chapter 5.2 (applies) |
| RK-01 | Rock Mass Rating (RMR₈₉) | Rock mass & rockfall | Chapter 3.9 (applies); Chapter 2.2 |
| RK-02 | Rock mass quality (Q-system) | Rock mass & rockfall | Chapter 2.2 |
| RK-03 | RMR–Q conversion | Rock mass & rockfall | Chapter 2.2 (applies) |
| RK-04 | RQD from volumetric joint count | Rock mass & rockfall | Chapter 4.1 (applies); Chapter 2.2 (applies) |
| RK-05 | GSI from RMR₈₉ | Rock mass & rockfall | Chapter 2.2 |
| RK-06 | Slope Mass Rating | Rock mass & rockfall | Chapter 6.3 (applies); Chapter 1.1 (applies); Chapter 3.8 (applies) |
| RK-07 | Generalized Hoek–Brown criterion | Rock mass & rockfall | Chapter 6.1 (applies); Chapter 6.3 (applies) |
| RK-08 | Rock mass deformation modulus | Rock mass & rockfall | Chapter 6.5 |
| RK-09 | Joint shear strength (Barton–Bandis) | Rock mass & rockfall | Chapter 6.3 (applies) |
| RK-10 | UCS from point load index | Rock mass & rockfall | Appendices; Chapter 3.9; Chapter 4.1; Chapter 2.2 (applies); Chapter 7.3; Chapter 2.3; Chapter 5.2 |
| RK-11 | Rockfall shadow angle | Rock mass & rockfall | Chapter 1.1 (applies); Chapter 3.8 (applies) |
| RK-12 | Rockfall Hazard Rating System scoring | Rock mass & rockfall | Chapter 1.1 (applies); Chapter 3.8 |
| LS-01 | Reach angle (Fahrböschung) vs. volume — rock avalanches | Landslide & debris flow | Chapter 1.1 (applies); Chapter 3.8 (applies) |
| LS-02 | Reach angle vs. volume — all landslide types | Landslide & debris flow | Chapter 1.1 (applies) |
| LS-03 | Debris-flow travel distance | Landslide & debris flow | Chapter 1.1 (applies); Chapter 3.8 (applies) |
| LS-04 | Debris-flow peak discharge | Landslide & debris flow | Chapter 1.1 (applies) |
| LS-05 | Debris-flow inundation area (LAHARZ-type) | Landslide & debris flow | Chapter 1.1 (applies) |
| LS-06 | Debris-flow velocity from superelevation | Landslide & debris flow | Chapter 3.8 (applies) |
| LS-07 | Landslide volume from area | Landslide & debris flow | Chapter 1.1 (applies) |
| LS-08 | Rainfall intensity–duration threshold (Caine) | Landslide & debris flow | Chapter 1.1 (applies); Chapter 3.8 |
| LS-09 | Rainfall intensity–duration threshold (global update) | Landslide & debris flow | Chapter 1.1 (applies); Chapter 3.8 (applies) |
| LS-10 | Newmark sliding displacement (regression) | Landslide & debris flow | Chapter 6.5; Chapter 1.1 (applies); Chapter 3.8 (applies) |