The manual is supported by a small set of apps on dirtbert.com. They run in any current web browser (Chrome, Edge, Safari or Firefox) on a desktop, laptop, tablet or phone. There is nothing to install and no account to create, except where a sign-in is noted below.
| App | What it does | On a desktop | On a phone | Where your work is kept |
|---|---|---|---|---|
| GHRM | This manual: eight sections (1.0 to 8.0), 37 chapters and the appendices. | Each chapter opens with an On this page list at the left and the section train across the top. Select a section heading to open it; Expand all opens every section. | The page narrows to one column and On this page folds into a button at the top: tap it, then tap a section. Turn the phone sideways for wide tables. | Checklist ticks are saved in this browser on this device. |
| GHRM Tools, Analytical Tools and the Calculator Map | Calculators, workbook guides and field forms from the Geotechnical Analysis Suite, listed by discipline or by manual chapter. | Calculators open in a new tab. The Apps and Analytical Tools section at the end of each Section 6.0 Analysis chapter (6.1, 6.2, 6.3, 6.4, 6.5), and the orange strips inside sections, link straight to them. | Calculators work on a phone; the workbook guides read best on a larger screen. | The calculators are on dirtbert.com and need a sign-in. |
| Ground Improvement Technology Selector | Narrows the 45 techniques of the technology library (7.2.16) to the ones that fit the problem and site. | Opens beside Chapter 7.2. | Same page, one column. | Nothing is stored. |
Open the app in the phone’s browser and add it to the home screen so it opens like an app:
Good candidates are the chapters you use most in the field.