Several sections of this manual draw on Profillidis, Railway Management and Engineering, which is written to UIC and European (EN) practice in metric units. AREMA and FRA remain the governing basis for North American work; the European material is included for the mechanics, the data and the design logic behind it. The terms and units below appear wherever that material is cited.
| European / UIC term | North American equivalent or conversion |
|---|---|
| Sleeper | Tie (crosstie) |
| Track bed | Ballast + subballast together |
| Formation layer | Engineered top-of-subgrade layer; comparable in role to a blanket or prepared subgrade layer |
| Subsoil | Native or embankment fill below the formation layer |
| Cant / cant deficiency | Superelevation / unbalanced superelevation |
| Longitudinal, transverse, horizontal defect | Surface (profile), cross-level, alignment |
| t (metric tonne) — axle load | 1 t = 2,205 lb; a 286,000-lb car on 4 axles ≈ 32.4 t/axle |
| kp/cm² (kilopond per cm²) | 1 kp/cm² ≈ 14.2 psi |
| t/mm (track or layer reaction coefficient) | 1 t/mm ≈ 56 kip/in. |
| ‰ (per mille) gradient | 10‰ = 1.0% grade |
| MGT / million tons of traffic | Same concept; UIC counts gross metric tons |
UIC axle-load categories for standard gauge: A = 16 t, B = 18 t, C = 20 t, D = 22.5 t (E = 25 t). Profillidis notes that standard-gauge axle loads in the USA are 28–35 tons, so European design charts calibrated to 22–25 tons sit well below North American heavy-haul loading. Track deterioration is reported to grow roughly with Q3 to Q4 (Q = axle load), so a modest axle-load increase produces a much larger increase in damage.
UIC line groups (UIC Code 714R) classify lines by a fictitious daily tonnage Tth that weights freight, locomotive and speed effects: group 1 > 130,000 t/day; group 2 = 80,000–130,000; group 3 = 40,000–80,000; group 4 = 20,000–40,000; group 5 = 5,000–20,000; group 6 < 5,000 t/day. Group 4 is described as representative of most lines worldwide. Several UIC thickness and maintenance rules in this manual are keyed to these groups.
Regulation, specification, code, standard and guideline are not interchangeable. In the book’s usage, regulations and specifications are rules issued by governmental or inter-governmental bodies that impose specific instructions or methods; codes are a form of legislation defining a procedure or performance to be followed; standards are uniform criteria developed by a national or international body and are suggested rather than obligatory; guidelines are non-mandatory recommendations.
After Profillidis (2014), §7.5 (axle and traffic load), §12 footnote (definitions). Conversions added by the authors. Full reference under Supplemental References.