↑ Parent Menu⌂ Main Menu
← Chapter 1.0 Manual Overview
GHRM
Railway Ground Hazard Risk Management · 1.0 · Introduction
Sections · click a car to open it

1.0.1 Purpose of This Manual

About this manual and how it is organized.
Authors: Daniel P. Colwell and Mario Ruel
1.0.1 Purpose of This Manual

Railway Ground Hazard Risk Management is a geotechnical reference for railroad clients. It is organized in eight sections that follow a project from start to finish: 1.0 Introduction (this overview and the risk framework); 2.0 The Underworld (the track foundation, how it fails, and the soil, rock and groundwater beneath it); 3.0 Risk Management (scoping, desktop study, drilling scope, reconnaissance, site conditions, access, cost, risk ratings and risk assessment); 4.0 Subsurface Exploration; 5.0 Testing; 6.0 Analysis; 7.0 Design; and 8.0 Reporting. Chapters are numbered by section and order, so Chapter 2.4 is the fifth chapter in Section 2.0, and its subsections are 2.4.1, 2.4.2 and so on. The manual was restructured this way in November 2026, when the chapters on scoping, desktop study, drilling scope, reconnaissance, site conditions, access, cost estimates, infiltration and seepage, and reporting (Chapters 3.1 to 3.7, 6.4 and 8.1 to 8.3) were added.

It is written for geotechnical engineers, geologists and field staff delivering investigation, design, construction-phase and ground hazard risk management services to Class I, regional and short line railroads, and to passenger and commuter operators.

Next · 1.0 Introduction → Chapter 1.1 — Introduction to Railway Ground Hazard Risk Management