↑ Parent Menu⌂ Main Menu
← Chapter 6.5 Seismic Hazard and Liquefaction
GHRM
Railway Ground Hazard Risk Management · 6.0 · Analysis
Sections · click a car to open it

Empirical Equations — Use and Limitations

Seismic hazard characterization and liquefaction evaluation are critical components of geotechnical services for railroad infrastructure in seismically active regions.
Authors: Daniel P. Colwell and Mario Ruel
Empirical Equations — Use and Limitations

The correlations used in this chapter are listed below. Each gives an estimate, not a test result. The full equation, variables, range of applicability, constraints and source for each one, and the note to record whenever one is used, are in the Empirical Equations & Correlations reference.

IDCorrelationGives
IS-01SPT energy & procedure correctionN₆₀
IS-02SPT overburden normalization (sands)(N₁)₆₀
IS-07Undrained shear strength of clay from SPTSᵤ
IS-11Cyclic resistance ratio of sand from SPTCRR₇.₅
IS-12Corrected cone resistanceqₜ
IS-13Soil behaviour type index (normalized)I꜀ / Qₜₙ / Fᵣ
IS-18Shear-wave velocity from CPTVₛ
IS-22Cyclic resistance ratio of sand from CPTCRR₇.₅
RK-08Rock mass deformation modulusEᵣₘ
LS-10Newmark sliding displacement (regression)Dₙ
IS-09Shear-wave velocity from SPTVₛ
IX-13Small-strain shear modulus (Hardin)G_max
← Previous · 6.0 Analysis Chapter 6.4 — Infiltration and Seepage
Next · 6.0 Analysis → Chapter 6.6 — Tunnels and Portals