Seed & Harder (1990) correlation with (N₁)₆₀ (SPT-based):
Representative values: (N₁)₆₀ = 5 → s_ur ≈ 100–250 psf; (N₁)₆₀ = 10 → s_ur ≈ 400–900 psf; (N₁)₆₀ = 15 → s_ur ≈ 1,000–2,000 psf. Use lower-bound values for critical structures.
Post-liquefaction slope stability is evaluated with residual strengths substituted for drained strength in Bishop or Janbu analyses (see Chapter 6.3), checking FS_residual ≥ 1.0 per USACE guidance and commonly ≥ 1.1 for mainline embankments (confirm with the owner railroad).
Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| sur | undrained shear strength = f[(N_1)_60] (read from Seed & Harder 1990 chart) | Lab or field test | Lab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening. | soft 250–500, stiff 1,000–2,000 psf · by USCS group |
| (N₁)₆₀ | SPT blow count = 10 → s_ur ≈ 400–900 psf | Field test | Standard Penetration Test (ASTM D1586); measure hammer energy (ASTM D4633, withdrawn 2025) to correct to N60. | loose sand 4–10, dense 30–50 blows/ft · by USCS group |
Volumetric strain ε_v for saturated sand under cyclic loading is estimated as a function of cyclic shear strain amplitude γ_c and (N₁)₆₀:
Where H_i = thickness of layer i (ft). For a layer with FS_L ≤ 1.0 and (N₁)₆₀ = 10, ε_v is typically 1–3%; for (N₁)₆₀ = 15, ε_v ≈ 0.1–1.0%.
Track geometry acceptance criteria (seismic):
| FRA Track Class | Max Speed (freight) | Allowable Seismic Settlement |
|---|---|---|
| Class 1 | 10 mph | 6.0 in. |
| Class 2 | 25 mph | 4.0 in. |
| Class 3 | 40 mph | 3.0 in. |
| Class 4 | 60 mph | 2.0 in. |
| Class 5 | 80 mph | 1.5 in. |
| Class 6 | 110 mph | 0.75 in. |
| Class 7 | 125 mph | 0.50 in. |
These values are this manual's suggestions, about twice the static limits of Table 6.2-1, reflecting the expectation of emergency resurfacing after an event. They are not FRA values; confirm them with the owner railroad.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Hi | thickness of layer i (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | typically 1–3% |
The Youd et al. (2002) MLR model estimates horizontal displacement D_H in meters (× 3.28 for feet) for free-face and gently sloping ground:
Free-face condition (embankment adjacent to water body):
Gently sloping ground:
Where:
For railroad bridge approaches over rivers and tidal waterways, D_H values exceeding 3 in. typically trigger mitigation requirements for Class 4 and above track.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| R | nearest horizontal distance to seismic energy source (km) | Published hazard / climate data | USGS seismic design data / ASCE 7 hazard tool for the site location and site class (from Vs30 or SPT). | project-specific |
| W | ratio of free-face height to distance to free face (%) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| S | ground slope (%) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| T₁₅ | cumulative thickness of saturated cohesionless layers with (N₁)₆₀ < 15 (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| F₁₅ | average fines content in T₁₅ layers (%) | Lab test | Percent passing No. 200 sieve: washed sieve analysis (ASTM D1140 / D6913). | clean < 5%; with fines > 12% · by USCS group |
| D50₁₅ | average median grain size in T₁₅ layers (in.) | Lab test | Grain-size curve: sieve (ASTM D6913) plus hydrometer for fines (ASTM D7928). Read D10, D30, D50, D60, D85 from the curve. | by USCS group |
Fill that has sunk below the water table. The Tokachi River dike in Hokkaido was built in stages over decades on peat (water content about 200%). Much of the fill settled into the peat. Excavation after the 1993 Kushiro-oki earthquake showed that the embankment base had been loosened by that subsidence and lateral spreading and, lying below the water table, was saturated and liquefied. Similar collapses occurred on the Kushiro River dike and the Yodo River dike (1995 Kobe). Railroad embankments built over peat or soft clay and repeatedly raised to restore grade share this geometry. The liquefiable layer may be the old embankment itself, not the natural foundation. Borings through the embankment should log and test the submerged fill “bulb”, not just the native soil beneath it.
Age of the deposit. In Dagupan City (1990 Luzon) and Kobe and Nishinomiya (1995), young hydraulic fill and 20th-century reclamation liquefied while older natural levee deposits and land inside the original shoreline did not. On a rail alignment, historic maps and aerial photos that show where channels, ponds or shorelines were filled are among the cheapest liquefaction screening tools available.
Source: Towhata, I. (2008). Geotechnical Earthquake Engineering. Springer