Seismic hazard characterization and liquefaction evaluation are critical components of geotechnical services for railroad infrastructure in seismically active regions.
The three examples cover liquefaction triggering, lateral spreading and slope displacement, the three seismic checks that most often decide a railroad design. Each is laid out as Given, Required, Equations, a flow chart of the steps with a spot check at each, and the Solution.
Example 6.5-1: SPT Liquefaction Triggering for a Bridge Replacement
A bridge replacement on a Class I railroad located over a tributary of the Willamette River in Oregon, designed for a magnitude 7.0 earthquake. The procedure compares the cyclic stress the earthquake applies with the cyclic resistance of the sand at the critical depth.
FSL = 0.60, well below 1.2: the sand is liquefiable, with about 4.5 in. of seismic settlement.
That exceeds what Class 4 track can tolerate, so remediation is needed; stone columns or deep soil mixing are the usual choices. The hammer energy was low and uncertain (rope and cathead), so a CPT sounding to confirm the extent of the loose layer is worth having before remediation is sized.
Example 6.5-2: Lateral Spreading at a Bridge Approach
A main line bridge on a Class I railroad located over the Obion River in western Tennessee, 18 mi from the New Madrid fault. A liquefiable layer runs out to a free face at the river, so the ground can spread laterally toward it. The Youd et al. (2002) regression, in metric units as published, estimates how far.
Given and required for Example 6.5-2.
Given
Variable
Value
Description
Mw
7.7
R
18 mi = 29.0 km
Distance to the fault
W
15%
Free-face ratio: 25-ft bank at 165 ft
T15
22 ft = 6.71 m
Thickness with (N1)60 < 15
F15
12%
Fines
D5015
0.008 in. = 0.203 mm
Required
Lateral displacement DH
Equations
Eq. 1: R* = R + 100.89M − 5.64 — modified distance, km
Spot check: The (100 − F15) term alone contributes +6.6 in log units; the low fines content drives the large result.
↓
Solution
About 13 ft of lateral spreading.
Solution
About 4 m (13 ft) of lateral spreading toward the river.
That is far beyond what track or a bridge abutment can accept (the manual’s threshold for Class 4 is about 3 in.). Options are deep ground improvement through the liquefiable layer, or deep foundations designed for the spreading load with an approach slab for the post-earthquake settlement. The regression has a standard error of about a factor of 2, so the decision does not hinge on the exact figure.
Example 6.5-3: Newmark Displacement of an Embankment Slope
A 28-ft embankment on a Class I railroad located in the Columbia River Gorge. Rather than a pass/fail pseudo-static factor of safety, the Newmark method estimates how far the slope would slide during the design earthquake, which can be compared directly with what the track tolerates.
Given and required for Example 6.5-3.
Given
Variable
Value
Description
FSstatic
1.65
Bishop, drained
ky
0.21g
Yield acceleration: pseudo-static FS = 1.0
amax
0.35g
Design earthquake, 475-yr
Threshold
1.0 in.
Table 6.5-5, no action below
Required
Median and upper-bound displacement
Equations
Eq. 1 (Jibson 2007): log Dn = 0.215 + log[(1 − ky/amax)2.341 (ky/amax)−1.438] ± 0.510 — Dn in cm; 0.510 is one standard deviation
Steps
Step 1 · Ratio
0.21/0.35
0.60
↓
Step 2 · Bracket
0.402.341 × 0.60−1.438 = 0.117 × 2.085
0.244
↓
Step 3 · Median
0.215 + log 0.244 = −0.398
Dn = 0.40 cm = 0.16 in.
↓
Step 4 · Upper bound (+1σ)
100.112
1.29 cm = 0.51 in.
↓
Solution
Median 0.16 in.; upper bound 0.51 in.: no action.
Solution
Median displacement about 0.16 in., upper bound about 0.5 in.; both below the 1.0-in. threshold.
No remediation is required. Add the embankment to the railroad’s post-earthquake inspection list, because the rigid-block model does not capture softening of the fill.
Empirical equation note · this section
Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.
IS-01 SPT energy & procedure correctionN₆₀Use: All soils tested by SPT (ASTM D1586). Normalizes blow count to 60% of theoretical free-fall energy, the basis for most U.S. correlations. Limits: CE ranges ~0.5–1.6 depending on hammer type; use measured energy (ASTM D4633, withdrawn 2025) where available. Rod-length factor ranges differ between Skempton (1986) and Youd et al. (2001).
IS-02 SPT overburden normalization (sands)(N₁)₆₀Use: Cohesionless soils; normalizes to σ'v0 = 1 atm. Cap of 1.7 recommended by NCEER workshop. Limits: Not applicable to clays. Unreliable at σ'v0 > ~4,200 psf, about 2 tsf (other CN forms preferred at depth).
LS-10 Newmark sliding displacement (regression)DₙUse: Rigid-block seismic slope displacement; 2,270 strong-motion records. Limits: Rigid-block assumption unsuitable for deep, compliant slides; ±0.510 is one standard deviation in log units. Alternative forms use Arias intensity or magnitude.