Site class is determined from the time-averaged shear wave velocity in the upper 100 ft:
Where:
| Site Class | Description | V_S30 (ft/s) | N̄ (blows/ft) | s̄_u (psf) |
|---|---|---|---|---|
| A | Hard rock | > 5,000 | — | — |
| B | Medium hard rock | 3,000–5,000 | — | — |
| BC | Soft rock | 2,100–3,000 | — | — |
| C | Very dense sand or hard clay | 1,450–2,100 | > 50 | > 2,000 |
| CD | Dense sand or very stiff clay | 1,000–1,450 | — | — |
| D | Medium dense sand or stiff clay | 700–1,000 | 15–50 | 1,000–2,000 |
| DE | Loose sand or medium stiff clay | 500–700 | — | — |
| E | Very loose sand or soft clay | < 500 | < 15 | < 1,000 |
| F | Requires site-specific analysis | — | — | — |
Note: ASCE 7-22 uses updated 8-class system (A through F with BC, CD, DE inserted). AASHTO LRFD 9th Ed. retains A–F notation; we reconcile in deliverables. V_S30 ranges are from ASCE 7-22 Table 20.2-1; the N̄ and s̄_u criteria are from ASCE 7-16 (Classes C, D and E), since ASCE 7-22 classifies by shear wave velocity.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| di | thickness of layer i (ft), Σd_i = 100 ft | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
Short-period amplification factor (F_a):
Long-period amplification factor (F_v):
Design spectral accelerations:
F_a and F_v are read from ASCE 7-22 Tables 11.4-1 and 11.4-2 as functions of site class and S_S or S_1 at the reference condition. Site-specific ground motion procedures (ASCE 7-22 Chapter 21) are required for Site Class F and, in some high-hazard cases, for other soft sites (ASCE 7-22 Section 11.4.8). Owner railroads may mandate site-specific response analysis for any Site Class E location along active mainline.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| SDS | 2 3 S_MS | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| SD1 | 2 3 S_M1 | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |