Railway Ground Hazard Risk Management · 6.0 · Analysis
Sections · click a car to open it

6.5.6 Cyclic Resistance Ratio from CPT Data

Seismic hazard characterization and liquefaction evaluation are critical components of geotechnical services for railroad infrastructure in seismically active regions.
Authors: Daniel P. Colwell and Mario Ruel
6.5.6 Cyclic Resistance Ratio from CPT Data
6.5.6.1 Normalized Tip Resistance
qc1N = CQ ⋅ qcPa    ;    CQ = (Paσ'v)n

Where n = 0.5 for clean sand; n is refined iteratively using the soil behavior type index I_c (Robertson & Wride 1998):

Ic = √(3.47 - log Qt)2 + (1.22 + log Fr)2
Qt = qt - σvPa ⋅ (Paσ'v)n ;    Fr = fsqt - σv × 100%

Robertson and Wride (1998): start with n = 1.0 and compute I_c. If I_c > 2.6, keep n = 1.0. If I_c ≤ 2.6, recompute with n = 0.5; if I_c is then above 2.6, use n = 0.75. Robertson (2009) gives a continuous form, n = 0.381 I_c + 0.05(σ'_v/P_a) − 0.15 ≤ 1.0.

Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • IS-13 Soil behaviour type index (normalized) I꜀ / Qₜₙ / FᵣUse: All CPT data; basis for SBT classification and most Robertson-family correlations below. Ic < 2.6 ≈ coarse-grained / drained; > 2.6 ≈ fine-grained / undrained. Limits: SBT is behaviour type, not grain-size classification. Cemented, aged, or sensitive soils plot misleadingly. Earlier n-exponent forms exist (Robertson & Wride 1998).
  • IS-22 Cyclic resistance ratio of sand from CPT CRR₇.₅Use: Level ground, Mw = 7.5, Ic ≤ 2.6; (qc1N)cs ≥ 160 considered non-liquefiable. Limits: For Ic > 2.6, sample and evaluate cyclic softening by lab methods. Thin-layer and transition-zone effects distort qc.
Inputs for the equations in this section (7)
SymbolWhat it isComes fromHow to get itTypical range
qc1NCPT tip resistance = C_Q ⋅ q_c P_aField testCone penetration test with pore pressure (CPTu, ASTM D5778).loose sand 20–40, dense 120–200 tsf · by USCS group
CQintermediate value computed on this pageAnother equationComputed: C_Q = ( P_a σ'_v )^nproject-specific
n0.5 for clean sandChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
IcCPT tip resistance = √ (3.47 - log Q_t)^2 + (1.22 + log F_r)^2Field testCone penetration test with pore pressure (CPTu, ASTM D5778).loose sand 20–40, dense 120–200 tsf · by USCS group
QtCPT tip resistance = q_t - σ_v P_a ⋅ ( P_a σ'_v )^nField testCone penetration test with pore pressure (CPTu, ASTM D5778).loose sand 20–40, dense 120–200 tsf · by USCS group
FrCPT tip resistance = f_s q_t - σ_v × 100%Field testCone penetration test with pore pressure (CPTu, ASTM D5778).loose sand 20–40, dense 120–200 tsf · by USCS group
σ'vvertical stress / pore pressureAnother equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
Cone Penetration Test
Cone Penetration Test
6.5.6.2 Fines Correction for CPT
(qc1N)cs = Kc ⋅ qc1N
Kc = 1.0 for Ic ≤ 1.64;  Kc = −0.403Ic4 + 5.581Ic3 − 21.63Ic2 + 33.75Ic − 17.88 for Ic > 1.64

Robertson and Wride (1998). Soils with Ic > 2.6 are generally treated as too clay-like to liquefy, subject to sampling and testing.

Inputs for the equations in this section (1)
SymbolWhat it isComes fromHow to get itTypical range
(qc1N)csclean-sand normalized tip resistance = K_c · q_c1NField testCone penetration test with pore pressure (CPTu, ASTM D5778).loose sand 20–40, dense 120–200 tsf · by USCS group
6.5.6.3 CRR from CPT (Robertson & Wride 1998)
CRR7.5 = 0.833 ⋅ (qc1N)cs1,000 + 0.05    for (qc1N)cs < 50
CRR7.5 = 93 ⋅ [(qc1N)cs1,000]3 + 0.08    for 50 ≤ (qc1N)cs < 160

For (q_c1N)_cs ≥ 160, the soil is non-liquefiable.

Inputs for the equations in this section (1)
SymbolWhat it isComes fromHow to get itTypical range
CRR7.5intermediate value computed on this pageAnother equationComputed: CRR_7.5 = 0.833 ⋅ (q_c1N)cs 1,000 + 0.05    for (qc1N)_cs < 50project-specific