Authors: Daniel P. Colwell and Mario Ruel. This chapter was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management.
Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.
Primary sources
Supplemental references
- Towhata, I. (2008). Geotechnical Earthquake Engineering. SpringerFind source ↗
- Elnashai, A. S. and Di Sarno, L. (2008). Fundamentals of Earthquake Engineering. WileyFind source ↗
- Ooms, M. The Effect of EPS Geofoam Backfill on the Seismic Performance of Integral Abutment Bridges. M.S. thesis, Rutgers UniversityFind source ↗
- Partner Engineering and Science, Inc. Seismic Zone Map of the United States (after the 1997 Uniform Building Code)Find source ↗
- Bolt, B. A., Horn, W. L., Macdonald, G. A. and Scott, R. F. (1977). Geological Hazards: Earthquakes, Tsunamis, Volcanoes, Avalanches, Landslides, Floods, 2nd ed. Springer-VerlagFind source ↗Library entry
File locations for these documents are listed under Supplemental References.