| Topic | Refer To |
|---|---|
| SPT N₆₀ and (N₁)₆₀ calculation procedure | Chapter 4.1, Section 4.1.3 |
| CPTu q_t correction and SBT classification | Chapter 5.1, Section 5.1.2 |
| MASW for V_S30 determination | Chapter 5.1, Section 5.1.6 |
| Groundwater measurement and seasonal monitoring | Chapter 2.8, Sections 2.8.2–2.8.3 |
| Slope stability — pseudo-static and residual strength | Chapter 6.3, Sections 6.3.4 and 6.3.9 |
| Embankment settlement under surcharge | Chapter 6.2, Section 6.2.4 |
| Ground improvement for liquefiable zones | Chapter 7.2 |
| Construction monitoring for ground improvement | Chapter 5.3, Section 5.3.5 |
| GDR documentation of seismic findings | Chapter 8.4, Section 8.4.4 |
| Laboratory grain size and fines content | Chapter 5.2, Sections 5.2.2–5.2.3 |
End of Chapter 6.5 — Seismic Hazard and Liquefaction