6.5.15 Practice Questions

Seismic hazard characterization and liquefaction evaluation are critical components of geotechnical services for railroad infrastructure in seismically active regions.
Authors: Daniel P. Colwell and Mario Ruel
6.5.15 Practice Questions
Each question is worked in the same five parts as the examples.
Question 6.5-1: SPT Triggering in the New Madrid Zone

Problem Statement

A Class I railroad main line in the New Madrid Seismic Zone runs on a low fill over loose silty sand with a shallow water table. A boring found the blow count shown at 15 ft. For the design magnitude 7.7 earthquake, the engineer must compute the factor of safety against liquefaction at that depth.

The procedure of Example 6.5-1 for a larger earthquake.

Low fillLoose silty sand, FC = 20%, γ = 118 pcf0510152025Depth (ft)GWT 4 ftN = 10 at 15 ftFSL = ?Main line, New Madrid Seismic ZoneGivenMw = 7.7PGA 0.50g rock; FPGA = 1.2N = 10 at 15 ft; GWT 4 ftγ = 118 pcf; FC = 20%Em 0.72; CR 0.85; CB, CS 1.0RequiredFSL at 15 ftBlack = given; red = required
Given and required for Question 6.5-1.

Given

VariableValueDescription
Mw7.7
PGA0.50g at rock; FPGA = 1.2
N10 at 15 ft
γ118 pcf; water at 4 ft
CorrectionsEm 0.72; CB 1.0; CR 0.85; CS 1.0
FC20%

Required

  • FSL

Equations

  1. Eq. 1: N60 = N EmCBCRCS/0.60; CN = (2,117/σ′v)0.5
  2. Eq. 2: ΔN = exp[1.63 + 9.7/(FC + 0.01) − (15.7/(FC + 0.01))²]; (N1)60,cs = (N1)60 + ΔN — fines correction (Idriss and Boulanger)
  3. Eq. 3: CRR7.5 = 1/(34 − N) + N/135 + 50/(10N + 45)² − 1/200 — Youd et al. (2001), N = (N1)60,cs
  4. Eq. 4: rd = 1.0 − 0.00233z (z in ft); CSR = 0.65(σv/σ′v)(amax/g) rd
  5. Eq. 5: MSF = 102.24/Mw2.56; FSL = CRR7.5/(CSR/MSF)

Steps

Step 1 · Stresses
σv = 1,770; σ′v = 472 + 612
1,084 psf
↓
Step 2 · (N1)60,cs
N60 = 10.2; CN = 1.40; 14.3 + 4.5
18.8
↓
Step 3 · CRR7.5
0.201
↓
Step 4 · CSR
0.65 × 1.633 × 0.60 × 0.965
0.615
↓
Step 5 · MSF and FSL
173.8/185.9 = 0.935; 0.615/0.935 = 0.658; 0.201/0.658
FSL = 0.31
↓
Solution
FSL = 0.31: highly liquefiable.

Solution

FSL ≈ 0.31: highly liquefiable.

For Mw above 7.5 the MSF is below 1, because a larger earthquake shakes for more cycles; dividing by it increases the adjusted demand. Ground improvement is warranted.

Question 6.5-2: Site Class and SDS

Problem Statement

A new railroad bridge is planned at a site where a shear wave survey gave the average velocity shown, and the mapped short-period spectral acceleration is 1.25g. The engineer must assign the site class and compute the design spectral acceleration for the bridge design.

SoilDense soilStiffer soil / rock0102030405060708090100Depth (ft)Vs30 = 780 ft/s (top 100 ft)Shear-wave survey at the bridge siteSite class = ? SDS = ?GivenVs30 = 780 ft/sSS = 1.25g (mapped)Fa = 1.0 (Site Class D)RequiredASCE 7-22 site classSDSBlack = given; red = required
Given and required for Question 6.5-2.

Given

VariableValueDescription
Vs30780 ft/s
SS1.25g
Fa1.0Site Class D

Required

  • ASCE 7-22 site class
  • SDS

Equations

  1. Eq. 1: SMS = Fa SS; SDS = (2/3) SMS

Steps

Step 1 · Class
700 to 1,000 ft/s
Site Class D (ASCE 7-22 Table 20.2-1)
↓
Step 2 · SDS
(2/3) × 1.0 × 1.25g
0.833g
↓
Solution
Site Class D; SDS = 0.833g.

Solution

Site Class D; SDS = 0.833g.

At this level of shaking, a site-specific ground response analysis is usually warranted for new bridge structures; check the owner’s threshold.

Question 6.5-3: Seismic Settlement Under High-Speed Track

Problem Statement

A passenger corridor operated at FRA Class 7 crosses an 8-ft layer of loose sand at 10 to 18 ft depth that has a factor of safety against liquefaction below 1. The corridor limits post-earthquake settlement to 0.50 in. The engineer must estimate the seismic settlement of the track and say whether it is acceptable.

FRA Class 7 trackLoose sand, 10 to 18 ft: (N1)60 = 9, FSL = 0.72εv = 2.5 to 3.0% (Tokimatsu and Seed)8 ftSettlement = ? ≤ 0.50 in.?Given8 ft loose sand at 10–18 ft(N1)60 = 9; FSL = 0.72εv = 2.5 to 3.0%Limit 0.50 in. (Class 7)RequiredSeismic settlementAcceptable?Black = given; red = required
Given and required for Question 6.5-3.

Given

VariableValueDescription
Layer8 ft of loose sand; (N1)60 = 9; FSL = 0.72At 10 to 18 ft
εv2.5 to 3.0%Tokimatsu and Seed (1987)
Limit0.50 in.Class 7, Section 6.5.7.2

Required

  • Seismic settlement and acceptability

Equations

  1. Eq. 1: S = εv H

Steps

Step 1 · S
0.028 × 8 × 12
2.7 in.
↓
Step 2 · Compare
2.7 >> 0.50
Not acceptable
↓
Solution
About 2.7 in.: not acceptable for passenger service.

Solution

About 2.7 in. of settlement, far above the 0.5-in. limit for Class 7 track.

Densify the layer (to (N1)60 near 30), treat it by deep soil mixing or grouting, or carry the track on a pile-supported slab that bypasses the layer.

Question 6.5-4: Newmark Displacement of a Mountain Slope

Problem Statement

A railroad sidehill fill on a mountain grade has a yield acceleration of 0.15g, and the design peak ground acceleration is 0.30g. The railroad accepts up to 1.0 in. of permanent displacement. The engineer must estimate the Newmark displacement and decide whether the slope is acceptable as it stands.

The method of Example 6.5-3.

Sliding massTrackamax = 0.30gky = 0.15gDn = ? Acceptable?Sidehill fill, mountain gradeGivenky = 0.15gamax = 0.30gAccept up to 1.0 in.RequiredMedian and upper-bounddisplacement; acceptabilityBlack = given; red = required
Given and required for Question 6.5-4.

Given

VariableValueDescription
ky0.15g
amax0.30g
Threshold1.0 in.Table 6.5-5

Required

  • Median and upper-bound displacement; acceptability

Equations

  1. Eq. 1 (Jibson 2007): log Dn = 0.215 + log[(1 − ky/amax)2.341 (ky/amax)−1.438] ± 0.510 — Dn in cm; 0.510 is one standard deviation

Steps

Step 1 · Bracket
0.52.341 × 0.5−1.438 = 0.50.903
log = −0.272
↓
Step 2 · Median
0.215 − 0.272 = −0.057
0.88 cm = 0.35 in.
↓
Step 3 · Upper bound
100.453
2.84 cm = 1.12 in.
↓
Solution
Median 0.35 in. acceptable; upper bound 1.12 in. marginal.

Solution

Median 0.35 in., acceptable; upper bound 1.12 in., just above the threshold.

Accept the slope with a post-earthquake inspection protocol and an inclinometer, so that any movement after an event is measured rather than assumed.

Question 6.5-5: Soil Behavior Type and CRR From a CPTu

Problem Statement

A piezocone sounding was made at a Class I railroad bridge approach in a seismic area. At 12 ft it recorded the tip resistance, sleeve friction and pore pressure shown. The engineer must compute the soil behavior type index and the cyclic resistance ratio to assess the liquefaction potential of the layer under the approach.

The Robertson and Wride iteration on the stress exponent n.

Approach fillSand / silty sand05101520Depth (ft)qc 50,000, fs 600, u2 80 psfIc = ? CRR7.5 = ?Piezocone at the bridge approachGivenAt 12 ft: qc = 50,000 psffs = 600 psf; u2 = 80 psfσv = 1,380 psf; σ′v = 840 psfNet area ratio a = 0.80RequiredIc and soil behavior typeCRR7.5Black = given; red = required
Given and required for Question 6.5-5.

Given

VariableValueDescription
qc, fs, u250,000; 600; 80 psfAt 12 ft
σv, σ′v1,380 and 840 psf
a0.80 (typical)

Required

  • Ic and soil behavior type
  • CRR7.5

Equations

  1. Eq. 1: Q = [(qt − σv)/pa](pa/σ′v)n; Fr = fs/(qt − σv) × 100
  2. Eq. 2: Ic = [(3.47 − log Q)² + (log Fr + 1.22)²]0.5 — start with n = 1; if Ic ≤ 2.6, use n = 0.5
  3. Eq. 3: Kc from Ic; CRR7.5 = 93(qc1N,cs/1,000)3 + 0.08 — Robertson and Wride (1998)

Steps

Step 1 · qt and Fr
50,000 + 80 × 0.20 = 50,016; 600/48,636
Fr = 1.23%
↓
Step 2 · n = 1
Q = 22.97 × 2.520 = 57.9
Ic = 2.15 ≤ 2.6: repeat with n = 0.5
↓
Step 3 · n = 0.5
Q = 22.97 × 1.587 = 36.5
Ic = 2.32: silty sand to sandy silt
↓
Step 4 · CRR
qc1N = 37.5; Kc = 2.00; qc1N,cs = 75; 93 × 0.075³ + 0.08
CRR7.5 = 0.12
↓
Solution
Ic = 2.32; CRR7.5 = 0.12.

Solution

Ic = 2.32 (silty sand to sandy silt, potentially liquefiable); CRR7.5 ≈ 0.12.

Compare with the site CSR to get FSL. With a CRR this low, almost any design earthquake in the Mississippi Delta will trigger liquefaction, so the question becomes the consequence: settlement and spreading.

Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • IS-01 SPT energy & procedure correction N₆₀Use: All soils tested by SPT (ASTM D1586). Normalizes blow count to 60% of theoretical free-fall energy, the basis for most U.S. correlations. Limits: CE ranges ~0.5–1.6 depending on hammer type; use measured energy (ASTM D4633, withdrawn 2025) where available. Rod-length factor ranges differ between Skempton (1986) and Youd et al. (2001).
  • IS-02 SPT overburden normalization (sands) (N₁)₆₀Use: Cohesionless soils; normalizes to σ'v0 = 1 atm. Cap of 1.7 recommended by NCEER workshop. Limits: Not applicable to clays. Unreliable at σ'v0 > ~4,200 psf, about 2 tsf (other CN forms preferred at depth).
  • IS-12 Corrected cone resistance qₜUse: All piezocone (CPTu) soundings; essential in soft clays and silts. Limits: Correction negligible in clean sands; critical in soft fine-grained soils. Requires u2 filter position.
  • IS-13 Soil behaviour type index (normalized) I꜀ / Qₜₙ / FᵣUse: All CPT data; basis for SBT classification and most Robertson-family correlations below. Ic < 2.6 ≈ coarse-grained / drained; > 2.6 ≈ fine-grained / undrained. Limits: SBT is behaviour type, not grain-size classification. Cemented, aged, or sensitive soils plot misleadingly. Earlier n-exponent forms exist (Robertson & Wride 1998).
  • LS-10 Newmark sliding displacement (regression) DₙUse: Rigid-block seismic slope displacement; 2,270 strong-motion records. Limits: Rigid-block assumption unsuitable for deep, compliant slides; ±0.510 is one standard deviation in log units. Alternative forms use Arias intensity or magnitude.
← Previous · 6.0 Analysis Chapter 6.4 — Infiltration and Seepage
Next · 6.0 Analysis → Chapter 6.6 — Tunnels and Portals