↑ Parent Menu⌂ Main Menu
← Chapter 6.5 Seismic Hazard and Liquefaction
GHRM
Railway Ground Hazard Risk Management · 6.0 · Analysis
Sections · click a car to open it

6.5.2 Probabilistic Seismic Hazard Analysis (PSHA) Framework

Seismic hazard characterization and liquefaction evaluation are critical components of geotechnical services for railroad infrastructure in seismically active regions.
Authors: Daniel P. Colwell and Mario Ruel
6.5.2 Probabilistic Seismic Hazard Analysis (PSHA) Framework
6.5.2.1 USGS National Seismic Hazard Maps

The USGS National Seismic Hazard Model (NSHM) provides the foundation for site-specific hazard characterization. For railroad projects, we access USGS Unified Hazard Tool (https://earthquake.usgs.gov/hazards/interactive/) to extract:

  • Peak Ground Acceleration (PGA) at the reference rock condition (V_S30 = 760 m/s, about 2,500 ft/s; the ASCE 7-16 Site Class B/C boundary)
  • Spectral accelerations at T = 0.2 s (S_S) and T = 1.0 s (S_1)
  • Selected return periods: 108-yr (FEE), 475-yr (DE), and 2,475-yr (MCE)
Table 6.5-1: Design Earthquake Return Periods
Railroad ClientFEE (yr)DE (yr)MCE (yr)Primary Standard
AREMALevel 1: about 50–100Level 2: 475Level 3: about 2,400AREMA MRE Chapter 9 — Seismic Design for Railway Structures

Owner railroads may set different values. Confirm them against the owner railroad's current standards when the work is scoped.

Note: AREMA's Level 1 (serviceability) event plays the role of the FEE; the DE (Level 2) usually governs new construction.

6.5.2.2 Deterministic Seismic Hazard Analysis (DSHA)

For structures within 6 miles of a known active fault (e.g., the Hayward Fault in the San Francisco Bay Area; the Cascadia Subduction Zone in the Pacific Northwest), we supplement PSHA with DSHA: assign maximum magnitude M_max to each fault source, compute median ground motion using attenuation relationships (Campbell-Bozorgnia 2014 NGA-West2 preferred), and compare with PSHA results. The governing hazard level is the greater of the two.

Supplemental reference

Legacy seismic zone maps in old railroad files

Bridge and wall records from before about 2000 often cite a UBC-style seismic zone (0, 1, 2A, 2B, 3, 4) rather than a PGA. Figure 14-S2 reproduces a commercial version of that map to help interpret those files. Zones were broad bands of approximate ground acceleration and carry no site class, return period or spectral shape, so do not use them for design or screening. Replace them with the USGS NSHM values described above.

Legacy seismic zone map of the United States (UBC zones 0–4) — for interpreting older records only; superseded by USGS NSHM ground motions.
Supplemental Figure 14-S2. Legacy seismic zone map of the United States (UBC zones 0–4) — for interpreting older records only; superseded by USGS NSHM ground motions. Source: Partner Engineering and Science, Inc. Seismic Zone Map of the United States (after the 1997 Uniform Building Code).

Source: Partner Engineering and Science, Inc. Seismic Zone Map of the United States (after the 1997 Uniform Building Code)

← Previous · 6.0 Analysis Chapter 6.4 — Infiltration and Seepage
Next · 6.0 Analysis → Chapter 6.6 — Tunnels and Portals