6.5.0 Executive Summary

Seismic hazard characterization and liquefaction evaluation are critical components of geotechnical services for railroad infrastructure in seismically active regions.
Authors: Daniel P. Colwell and Mario Ruel
6.5.0 Executive Summary

Seismic hazard characterization and liquefaction evaluation are critical components of geotechnical services for railroad infrastructure in seismically active regions. Rail corridors operated by Class I railroad traverse some of the highest seismic hazard zones in North America — the Pacific Coast, Cascades, Intermountain West, New Madrid Seismic Zone (NMSZ), and St. Lawrence Valley. Even apparently moderate-seismicity regions crossed by owner railroads may require assessment for NMSZ influence and localized fault activity.

This chapter provides the analytical framework for: (1) characterizing probabilistic seismic hazard using USGS national hazard maps; (2) classifying site response using V_S30 and ASCE 7 / AASHTO site categories; (3) evaluating liquefaction triggering potential using the Seed-Idriss Simplified Procedure for both SPT and CPT data; (4) quantifying post-liquefaction consequences including lateral spreading, seismic settlement, and residual strength loss; (5) performing Newmark sliding block analysis for seismically induced slope deformation; and (6) applying client-specific seismic performance criteria across owner railroads. All equations are presented in English units.

Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • LS-10 Newmark sliding displacement (regression) DₙUse: Rigid-block seismic slope displacement; 2,270 strong-motion records. Limits: Rigid-block assumption unsuitable for deep, compliant slides; ±0.510 is one standard deviation in log units. Alternative forms use Arias intensity or magnitude.