| Boring | Depth (ft) | N_meas | E_m | N₆₀ | C_N | (N₁)₆₀ | FC (%) | ΔN | (N₁)₆₀cs | CRR₇.₅ | CSR₇.₅ | FS_L | Status |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B-1 | 10 | 8 | 0.72 | 8.2 | 1.54 | 12.6 | 22 | 4.8 | 17.4 | 0.185 | 0.328 | 0.56 | Liquefiable |
| B-1 | 20 | 14 | 0.72 | 14.3 | 1.20 | 17.2 | 18 | 4.1 | 21.3 | 0.232 | 0.388 | 0.60 | Liquefiable |
| B-1 | 30 | 22 | 0.72 | 22.4 | 1.02 | 22.9 | 8 | 0.4 | 23.2 | 0.261 | 0.408 | 0.64 | Liquefiable |
| B-2 | 10 | 6 | 0.72 | 6.1 | 1.54 | 9.4 | 28 | 5.3 | 14.7 | 0.157 | 0.328 | 0.48 | Liquefiable |
| B-2 | 20 | 18 | 0.72 | 18.4 | 1.20 | 22.1 | 12 | 2.1 | 24.2 | 0.276 | 0.388 | 0.71 | Liquefiable |
| B-3 | 10 | 24 | 0.72 | 24.5 | 1.54 | 37.8 | 5 | 0.0 | 37.8 | NC | 0.328 | NC | Non-liquefiable |
| B-3 | 20 | 31 | 0.72 | 31.6 | 1.20 | 38.0 | 3 | 0.0 | 38.0 | NC | 0.388 | NC | Non-liquefiable |
NC = Non-liquefiable ((N₁)₆₀cs ≥ 30). Computed with the Example 6.5-1 inputs: γ = 120 pcf, water table at 5 ft, a_max = 0.456g, M_w = 7.0 (MSF = 1.19), C_R = 0.85, C_B = C_S = 1.0. FS_L values below 1.20 are flagged against the assumed DE minimum (Table 6.5-4).
Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.