6.5.4 Liquefaction Triggering — Seed-Idriss Simplified Procedure

Seismic hazard characterization and liquefaction evaluation are critical components of geotechnical services for railroad infrastructure in seismically active regions.
Authors: Daniel P. Colwell and Mario Ruel
6.5.4 Liquefaction Triggering — Seed-Idriss Simplified Procedure
6.5.4.1 Cyclic Stress Ratio (CSR)

The earthquake-induced cyclic shear stress ratio at depth z (ft) is:

CSRM,σ' = 0.65 ⋅ σvσ'v ⋅ amax ⋅ rd

Where:

  • σ_v = total vertical stress at depth z (psf)
  • σ'_v = effective vertical stress at depth z (psf)
  • a_max = peak ground acceleration at ground surface (ft/s²) = PGA × 32.2 ft/s²
  • r_d = stress reduction coefficient (dimensionless)

Stress reduction coefficient r_d (depth z in feet):

rd = 1.0 - 0.00233z    for z ≤ 30 ft
rd = 1.174 - 0.00814z    for 30 ft < z ≤ 75 ft
rd = 0.744 - 0.00244z    for 75 ft < z ≤ 98 ft
rd = 0.50    for z > 98 ft

Liao and Whitman (1986), as given in Youd et al. (2001), converted from meters to feet.

Inputs for the equations in this section (4)
SymbolWhat it isComes fromHow to get itTypical range
σvtotal vertical stress at depth z (psf)Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
σ'veffective vertical stress at depth z (psf)Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
amaxpeak ground acceleration at ground surface (ft/s²) = PGA × 32.2 ft/s²Published hazard / climate dataUSGS seismic design data / ASCE 7 hazard tool for the site location and site class (from Vs30 or SPT).project-specific
rdstress reduction coefficient (dimensionless)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
6.5.4.2 Magnitude Scaling Factor (MSF)

The CSR reference condition is M_w = 7.5. For other magnitudes, correct using the Magnitude Scaling Factor (Youd et al. 2001):

MSF = 102.24Mw2.56    (Idriss 1999)
Table 6.5-3: Magnitude Scaling Factors
M_wMSF
5.52.20
6.01.76
6.51.44
7.01.19
7.51.00
8.00.84
8.50.72

The adjusted CSR for comparison with CRR:

CSR7.5 = CSRM,σ'MSF
Inputs for the equations in this section (1)
SymbolWhat it isComes fromHow to get itTypical range
MSF10^2.24 M_w^2.56    (Idriss 1999)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
6.5.4.3 Overburden Correction Factor (K_σ)

For effective stresses exceeding 1 atm (2,117 psf), the cyclic resistance decreases. NCEER recommends:

Ksigma = (σ'vPa)f-1

Where f = 0.7–0.8 for relative density of 40–60% and 0.6–0.7 for 60–80% (Youd et al. 2001). K_σ ≤ 1.0.

Inputs for the equations in this section (2)
SymbolWhat it isComes fromHow to get itTypical range
f0.7 to 0.8 (conservative practice: use f = 0.7 for coarse sand, 0.8 for fine sand)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
σ'vvertical stress / pore pressureAnother equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
6.5.4.4 Sloping Ground Correction Factor (K_α)

For embankment slopes with static shear stress τ_s applied to the failure plane:

Kalpha = f(α, φ', DR)

Where α = τs / σ'v. For railroad embankments with side slopes 2H:1V to 3H:1V and loose-to-medium dense fill, Kα is read from NCEER (Youd et al. 2001) K_α chart based on relative density; Youd et al. (2001) advise caution in applying K_α in routine practice. Kα > 1.0 increases CRR; for loose sands (D_R < 45%) K_α < 1.0 and reduces resistance.

Earthquake loading and train loading fail soil in different ways

Selig and Waters set out three cyclic failure modes:

  • Flow liquefaction happens only in contractive soils: loose sands and sensitive clays. In one consolidated-undrained test on loose sand, effective confining stress fell from 58 psi to about 2 psi and strength nearly vanished. The steady-state line shows that a looser state is needed for flow at lower confining stress.
  • Cyclic mobility occurs when the shear stress reverses, as in earthquake shaking of level ground. Effective stress approaches zero at each reversal, and the soil fails through growing cyclic strain amplitude. It can occur at any density, but the number of cycles to failure rises with relative density and confining stress.
  • Train loading of the subgrade generally has no stress reversal. Pore pressure rises toward a limit, and the soil fails by accumulating permanent strain at an increasing rate (Selig & Chang, 1981).

Practical consequence. The Seed–Idriss triggering methods in this chapter address earthquake loading. The cyclic softening of a subgrade under traffic is checked differently, using threshold stress and cumulative plastic strain (Chapter 2.3, §3.4.2). A site can pass one check and fail the other.

After Selig & Waters (1994), ch. 3. Full reference under Supplemental References.