For seismically induced slope deformation, the Newmark (1965) sliding block method estimates permanent displacement U_d (in.) by integrating the earthquake acceleration record above the critical (yield) acceleration k_y:
Critical (yield) acceleration:
Where α = angle of the sliding plane (or the thrust direction of the sliding mass) from horizontal; for an infinite slope, α = slope angle β.
Source: Newmark, N.M. (1965), "Effects of earthquakes on dams and embankments," Géotechnique 15(2), 139–160; Jibson, R.W. (2007), "Regression models for estimating coseismic landslide displacement," Engineering Geology 91, 209–218, Eq. 1.

More rigorously, k_y is determined by reducing the pseudo-static coefficient until FS_pseudo = 1.0 in Bishop or Janbu analysis (Chapter 6.3).
Newmark permanent displacement — Jibson (2007) regression (preferred for engineering practice):
Where U_d (D_n in Jibson 2007) is in centimeters; divide by 2.54 for inches. ±0.510 is one standard deviation of log U_d. Alternatively, use Saygili & Rathje (2008) for two-parameter models including PGV.
| U_d (in.) | Performance Interpretation | Action |
|---|---|---|
| < 1.0 | Negligible deformation | No action |
| 1.0–3.0 | Minor; localized cracking expected | Monitor post-event |
| 3.0–6.0 | Moderate; track geometry affected | Remediation or speed restriction |
| > 6.0 | Significant slope movement | Track OOS; remediation required |
| > 12.0 | Slope failure probable | Emergency response; line closure |
Thresholds are this manual's suggestions for FRA Class 4 track; for high-speed passenger corridors, use about half the values shown.
Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.
Liquefaction (Section 6.5.5.4) is one way an earthquake damages track; the other is a slope or embankment that moves without liquefying. Duncan, Wright and Brandon set out the simpler tools. A pseudo-static analysis replaces the shaking with a constant horizontal force kW. Newmark's sliding block method then estimates how far the slope moves. The slope is treated as a rigid block that slips whenever the ground acceleration exceeds its yield acceleration kyg, which is the seismic coefficient that brings the factor of safety to exactly 1.0. Every pulse above that level adds a small permanent displacement. Wyllie and Mah apply the same ideas to rock slopes and quote the California Division of Mines and Geology (CDMG) guidance on how much movement matters. The Navy's soil dynamics handbook lists the slopes most vulnerable: steep slopes of weak, fractured rock or loess, loose saturated sand, and sensitive clays.
Equation 6.5-4. Pseudo-static factor of safety, yield coefficient and single-pulse displacement
Rock plane: FS = [cA + (W(cosψp − k sinψp) − U − V sinψp) tanφ] / [W(sinψp + k cosψp) + V cosψp]
ky: the k for which F = 1.0; one rectangular pulse: δ = (agt0)²/(2ay) × (1 − ay/ag)
| Item | Guidance |
|---|---|
| Seismic coefficient for a pseudo-static check | k = 0.5 × design PGA, with F of 1.0 to 1.2 acceptable, where no strength loss is expected (CDMG 1997, after Hynes-Griffin and Franklin) |
| Use more than 0.5 PGA | Smooth planar joints or bedding with no infilling that lose strength with small movement; slopes on topographic highs where shaking is amplified |
| Newmark displacement 0 to 100 mm (0 to 4 in.) | Unlikely to correspond to serious landslide movement |
| 100 to 1,000 mm (4 to 40 in.) | Serious ground cracking, or enough strength loss for continuing failure after the earthquake |
| Over 1,000 mm (40 in.) | Damaging landslide movement; consider the slope unstable |
A displacement of a few centimeters can drop a smooth, infilled plane to residual strength, while a fractured rock mass can move meters with little strength loss.
The plane failure equations were checked against Wyllie and Mah's Example Problem 6.1, a 39.4 ft cut at 60° on bedding dipping 35°, with c = 522 psf, φ = 37° and a tension crack 13.1 ft behind the crest. The calculator gives 1.25 with 9.8 ft of water in the crack, 1.07 with the crack full, 1.54 drained, and 1.08 drained with no cohesion. The published values are 1.25, 1.07, 1.54 and 1.08. The calculator's block weight reproduces the book's 1,241.7 kN/m (85,100 lb/ft). The Newmark integration was checked with a single 0.3g rectangular pulse lasting 0.2 s at the worked example's ky of 0.194: the integration gives 1.26 in., matching Wyllie and Mah's closed-form Equation 6.39.
A 2H:1V fill slope with a possible shallow slide 6 ft deep (c′ = 100 psf, φ′ = 30°, dry) has a static factor of safety of 1.50. At the CDMG seismic coefficient of 0.15 (half of a 0.30g PGA) the pseudo-static factor is 1.09, just above 1.0. The yield coefficient is 0.194 g. Five cycles of 0.30g shaking at a 0.5 s period move the block about 2.22 in., under the CDMG threshold for serious movement. With the water table halfway up the slide depth the displacement rises to about 11 in., and at a 0.60g PGA to about 18 in., because only the part of each pulse above ky counts.
Open the seismic slope displacement calculator →
Static and pseudo-static factors of safety, the yield coefficient by bisection, and Newmark one-way sliding block displacement for sine pulses, a rectangular pulse or a pasted acceleration record, for an infinite slope or a rock plane failure.
These documents are in the reference library. The summaries above are paraphrased; equations and tabulated values are standard or published. Individual railroads, clients and projects are not named.