Material in the green “Supplemental reference” boxes throughout this chapter was added from the following documents in the LEVI geotechnical library. Text is summarized or paraphrased; tables are reproduced with their original source noted; figures are reproduced from the cited document for internal reference use. Consult the original document before relying on a value for design. Blocks marked “After Selig & Waters (1994)” summarize item S8 for railroad clients; tables are condensed from the book and its figures are not reproduced.
- Towhata, I. (2008). Geotechnical Earthquake Engineering. SpringerFind source ↗
- Elnashai, A. S. and Di Sarno, L. (2008). Fundamentals of Earthquake Engineering. WileyFind source ↗
- Ooms, M. The Effect of EPS Geofoam Backfill on the Seismic Performance of Integral Abutment Bridges. M.S. thesis, Rutgers UniversityFind source ↗
- Partner Engineering and Science, Inc. Seismic Zone Map of the United States (after the 1997 Uniform Building Code)Find source ↗
- Bolt, B. A., Horn, W. L., Macdonald, G. A. and Scott, R. F. (1977). Geological Hazards: Earthquakes, Tsunamis, Volcanoes, Avalanches, Landslides, Floods, 2nd ed. Springer-VerlagFind source ↗Library entry
- Profillidis, V. A. (2014). Railway Management and Engineering, 4th ed. Farnham, UK: Ashgate. Chapters 7–9, 11–13, 16–17, 20 and 22 (track system, mechanical behavior of track, subgrade, sleepers, ballast, transverse effects, maintenance, slab track, electrification foundations, safety)Find source ↗Library entry
- Geotechnology for Railroaders Program, Modules 1–8 (two-day training course reference: risk management, geology and soils, ballast and sub ballast, drainage, slides, slope and subgrade stabilization, scour, rock falls, beaver dams, winter problems, spring thaw, extreme weather, earthquakes). Field photographs and figures from the course; slope stabilization process slides adapted from material by D. ColwellFind source ↗
- Selig, E. T. and Waters, J. M. (1994). Track Geotechnology and Substructure Management. London: Thomas Telford. Used on this page: ch. 3Find source ↗Library entry
Photograph credits
The photographs in this chapter come from the Geo Technology Reference library. Each is credited as stated in its source document; they are reproduced for reference and remain the property of the credited owners.
- Photo 6.5.5-1 — SPT liquefaction chart for magnitude 7.5 earthquakes. Youd et al. (2001); with permission from ASCE. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗