Seismic hazard characterization and liquefaction evaluation are critical components of geotechnical services for railroad infrastructure in seismically active regions.
Authors: Daniel P. Colwell and Mario Ruel
6.5.17 Apps and Analytical Tools5

The web apps and the Geotechnical Analysis Suite calculators and workbook guides for this part of the analysis, gathered here from across the manual in the November 2026 restructure: 5 tools (1 interactive calculators). Where a tool applies to a particular section of this chapter it is also placed in that section in an orange tools strip. Each row lists the chapters and sections where the tool is used. Calculators open on dirtbert.com (sign-in required).

Apps

Each app runs in a web browser on a desktop or a phone, with nothing to install. How to use the apps (1.0.3).

Tools

Slope Stability & Seismic
SSIBC 2000 Site ClassUsed in Chapter 6.5, 6.5.3 Site Classification and Ground Motion Amplificationguide onlyGuide
SSLiquefactionUsed in Chapter 6.5, 6.5.7 Post-Liquefaction Consequencesguide onlyGuide
SSLiquefaction Building Settlement (Bray–Macedo 2017)Used in Chapter 6.5, 6.5.7 Post-Liquefaction Consequencesguide onlyGuide
SSSeismic Site Class DeterminationUsed in Chapter 5.1, 5.1.6 Multichannel Analysis of Surface Waves (MASW); Chapter 6.5, 6.5.3 Site Classification and Ground Motion Amplificationguide onlyGuide
SSSeismic Slope Displacement (Bray–Travasarou)Used in Chapter 3.8, 3.8.6 Seismic Mechanisms; Chapter 6.5, 6.5.1 Background and Railroad ContextCalculator ▸Guide

Calculator: Liquefaction Triggering (SPT) (Section 6.5.5.4)

Calculator: Critical Speed on Soft Ground (Section 6.5.18)

Calculator: Seismic Slope Displacement (Newmark) (Section 6.5.8.1)