6.5.14 Seismic Hazard and Liquefaction Investigation Checklist

Seismic hazard characterization and liquefaction evaluation are critical components of geotechnical services for railroad infrastructure in seismically active regions.
Authors: Daniel P. Colwell and Mario Ruel
6.5.14 Seismic Hazard and Liquefaction Investigation Checklist

Checklist · Part VI · Geotechnical Analysis

Seismic Hazard and Liquefaction Investigation Checklist

Pre-Field / Desktop Phase0 of 5
Field Investigation Phase0 of 7
Analysis Phase0 of 11
Deliverable Phase0 of 6
Ticks are saved in this browser.
Plain text version

Pre-Field / Desktop Phase

  • [ ] Extract USGS PGA (FEE, DE, MCE) for all structure locations using Unified Hazard Tool
  • [ ] Identify mapped fault sources within 31 miles; collect fault geometry and M_max data
  • [ ] Assign preliminary ASCE 7 site class from existing boring logs or regional geology
  • [ ] Screen all locations against client PGA trigger threshold (Table 6.5-6)
  • [ ] Obtain historic seismicity catalog (USGS ComCat) and check for felt-earthquake reports along corridor

Field Investigation Phase

  • [ ] Perform continuous SPT at 2.5-ft intervals from WT to 50 ft at all screened locations
  • [ ] Measure hammer energy ratio (ERm) with instrumented rod; document hammer type and trip mechanism
  • [ ] Measure static water table depth in all borings; install piezometers at key sites for seasonal monitoring
  • [ ] Deploy CPTu soundings paired with borings at representative cross-sections
  • [ ] Collect disturbed samples at all liquefiable intervals for grain size and fines content (ASTM D6913/D7928)
  • [ ] Perform MASW or seismic CPTu at minimum one location per site to establish V_S30
  • [ ] Document groundwater-bearing strata, artesian conditions, and seasonal WT range

Analysis Phase

  • [ ] Compute N₆₀ with full energy/correction chain per Chapter 4.1
  • [ ] Compute (N₁)₆₀ using C_N with P_a = 2,117 psf; confirm C_N ≤ 1.7
  • [ ] Apply fines correction ΔN; document FC basis (lab or CPT I_c estimate)
  • [ ] Calculate CSR at all SPT depths using depth-adjusted a_max and r_d
  • [ ] Apply appropriate MSF, K_σ, and K_α; document all correction factors
  • [ ] Compare FS_L to client minimum (Table 6.5-4) at both DE and MCE return periods
  • [ ] Estimate seismic settlement (Tokimatsu & Seed) for all liquefiable layers
  • [ ] Estimate lateral spreading (Youd MLR) for waterway crossings and free-face conditions
  • [ ] Perform Newmark analysis for all embankment slopes with static FS ≥ 1.0 and PGA ≥ 0.10g
  • [ ] Compute post-liquefaction residual FS using Seed & Harder s_ur (lower bound)
  • [ ] Evaluate bridge approach settlement differential; compare to FRA track class tolerance

Deliverable Phase

  • [ ] Prepare liquefaction summary table (milepost, depth, FS_L, settlement estimate, remediation flag)
  • [ ] Include CSR/CRR triggering chart with all test points plotted
  • [ ] Provide site class determination with V_S30 calculation table
  • [ ] Document all ground motion inputs (USGS query output as appendix)
  • [ ] Provide remediation recommendation with conceptual layout for any FS_L < minimum
  • [ ] Deliver GIS shapefile with seismic risk attributes per client data standard (Table 6.5-6)
Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • IS-01 SPT energy & procedure correction N₆₀Use: All soils tested by SPT (ASTM D1586). Normalizes blow count to 60% of theoretical free-fall energy, the basis for most U.S. correlations. Limits: CE ranges ~0.5–1.6 depending on hammer type; use measured energy (ASTM D4633, withdrawn 2025) where available. Rod-length factor ranges differ between Skempton (1986) and Youd et al. (2001).
  • IS-02 SPT overburden normalization (sands) (N₁)₆₀Use: Cohesionless soils; normalizes to σ'v0 = 1 atm. Cap of 1.7 recommended by NCEER workshop. Limits: Not applicable to clays. Unreliable at σ'v0 > ~4,200 psf, about 2 tsf (other CN forms preferred at depth).
  • IS-13 Soil behaviour type index (normalized) I꜀ / Qₜₙ / FᵣUse: All CPT data; basis for SBT classification and most Robertson-family correlations below. Ic < 2.6 ≈ coarse-grained / drained; > 2.6 ≈ fine-grained / undrained. Limits: SBT is behaviour type, not grain-size classification. Cemented, aged, or sensitive soils plot misleadingly. Earlier n-exponent forms exist (Robertson & Wride 1998).
  • IS-18 Shear-wave velocity from CPT VₛUse: Young, uncemented Holocene–Pleistocene soils. Limits: Underpredicts Vs in aged or cemented soils. Measure Vs directly for seismic site class.
  • RK-08 Rock mass deformation modulus EᵣₘUse: Based on ~500 in-situ measurements (China, Taiwan). Limits: Use simplified form Erm = 14,500,000 [(1 − D/2)/(1 + e((75+25D−GSI)/11))] psi only if Ei is unknown.