GHRMCalculators · Chapter 5.2, Section 5.2.25

Atterberg Limits

Companion to Chapter 5.2 · Laboratory Testing Program, Section 5.2.25 Atterberg Limits: Data Reduction. English units throughout.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell