A well-planned geotechnical investigation is the foundation of every successful railroad engineering project.
Authors: Daniel P. Colwell and Mario Ruel
I.14 Cross-References to Technical Chapters
TopicChapter
Investigation planning — boring layout, depths, AREMA MRE Chapter 1.1 complianceChapter 3.9
Drilling, sampling, SPT corrections, boring logs in client-required formatsChapter 4.1
In situ testing — CPT, VST, PMT, MASW for soft ground characterizationChapter 5.1
Soil and rock classification — USCS, AASHTO, AREMA MRE Chapter 1.1 subgrade categoriesChapter 2.2
Groundwater — piezometers, permeability, seepage, dewatering for constructionChapter 2.8
Bearing capacity — Cooper E-80 loading, spread footings, piles, drilled shafts per AREMA MRE Ch. 8Chapter 6.1
Settlement — consolidation time rate; comparison to FRA and client geometry tolerancesChapter 6.2
Slope stability — AREMA MRE Chapter 1.1 embankment design, USACE EM 1110-2-1902Chapter 6.3
Seismic hazard and liquefaction — ASCE 7 site class; CPT and SPT methodsChapter 6.5
Pavement subgrade — CBR, resilient modulus, AASHTO 1993 design for yard pavingChapter 7.3
Ground improvement — preloading, PVDs, stone columns, DSM; client schedule implicationsChapter 7.2
Retaining structures — earth pressure, wall types, drainage; AREMA MRE Chapter 2.2Chapter 7.1
Railroad track subgrade — AREMA MRE Chapter 1.1 loading, subgrade failure modes, ballast designChapter 2.3
Construction monitoring — compaction acceptance, pile driving, instrumentationChapter 5.3
Report preparation — format by client, GSPsChapter 8.4
Laboratory testing program — test standards, testing plan, acceptance criteriaChapter 5.2

Chapter 3.9 — Geotechnical Investigation Planning and Scope

Primary Source: USACE EM 1110-1-1804, Geotechnical Investigations, 1 January 2001; AREMA Manual for Railway Engineering (MRE), Chapter 1 — Roadway and Ballast; client-specific railroad engineering standards as cited.