A well-planned geotechnical investigation is the foundation of every successful railroad engineering project.
Authors: Daniel P. Colwell and Mario Ruel
Author and Sources

Authors: Daniel P. Colwell and Mario Ruel. This chapter was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management.

Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.

Primary sources

Supplemental references

  • A Class I railroad (2018). Design and Construction Standard Specifications — Pipeline Occupancies. Office of VP–Engineering, Jacksonville, FL (rev. June 5, 2018)Find source ↗
  • A Class I railroad. Guidelines for Under Track CulvertsFind source ↗
  • Ruel, M. and KRK (2003). General Requirements for Geotechnical Investigations for the railroad's Bridge Construction Projects and “A Practical Approach to Lateral Loading on Piles for Railroad Bridge Design on Class I railroad Projects.” a Class I railroadFind source ↗
  • Look, B. G. (2007). Handbook of Geotechnical Investigation and Design Tables. Taylor & FrancisFind source ↗
  • Repetto, P. C. (2003). “Geo-Environment,” Ch. 26 in The Civil Engineering Handbook, 2nd ed. CRC PressFind source ↗Library entry
  • Clevenger, A. P. and Huijser, M. P. (2011). Wildlife Crossing Structure Handbook: Design and Evaluation in North America. FHWA-CFL/TD-11-003Find source ↗
  • Miesner, T. O. and Leffler, W. L. (2006). Oil and Gas Pipelines in Nontechnical Language. PennWellFind source ↗
  • Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case studies §1.7, §2.5Find source ↗Library entry

File locations for these documents are listed under Supplemental References.

Project management sources

  • Miller, D. P. (2009). Building a Project Work Breakdown Structure: Visualizing Objectives, Deliverables, Activities, and Schedules. ESI International Project Management Series. Boca Raton, FL: Auerbach Publications (CRC Press, Taylor & Francis Group)Find source ↗
  • Oberlender, G. D. (2000). Project Management for Engineering and Construction, 2nd ed. Boston: McGraw-HillFind source ↗
  • Cretu, O., Stewart, R. and Berends, T. (2011). Risk Management for Design and Construction. Hoboken, NJ: John Wiley & SonsFind source ↗
  • Levy, S. M. (2010). Construction Process Planning and Management: An Owner’s Guide to Successful Projects. Burlington, MA: Butterworth-Heinemann (Elsevier)Find source ↗
  • Seeley, I. H. (1993). Civil Engineering Quantities, 5th ed. Basingstoke: The Macmillan PressFind source ↗
  • Hutchings, J. F. (2004). Project Scheduling Handbook. Civil and Environmental Engineering Series, Vol. 15. New York: Marcel Dekker, Inc.Find source ↗
  • Chartered Institute of Building (2014). Code of Practice for Project Management for Construction and Development, 5th ed. Chichester, UK: John Wiley & SonsFind source ↗
  • American Society of Civil Engineers (2012). Quality in the Constructed Project: A Guide for Owners, Designers, and Constructors, 3rd ed. ASCE Manuals and Reports on Engineering Practice No. 73. Reston, VA: ASCEFind source ↗
  • Skill Right (2013). Project Management Tools and Techniques: An Introductory Course in Project Management Foundations [training slides sponsored by Texas Instruments, Inc.; minor modifications by N. Santiago, Spring 2013 version]Find source ↗
  • Kelly, J., Male, S. and Graham, D. (2004). Value Management of Construction Projects. Oxford: Blackwell ScienceFind source ↗
  • Rad, P. F. (2002). Project Estimating and Cost Management. Vienna, VA: Management ConceptsFind source ↗