| Related Topic | Chapter |
|---|
| SPT corrections, sampling methods, boring log format | Chapter 4.1 |
| CPT, VST, PMT, and geophysical methods for site characterization | Chapter 5.1 |
| Soil and rock classification — USCS, AASHTO, AREMA MRE Ch. 1 categories | Chapter 2.2 |
| Groundwater characterization, piezometers, permeability testing | Chapter 2.8 |
| Bearing capacity calculations — Cooper E-80 loading, AREMA MRE Ch. 8 | Chapter 6.1 |
| Settlement analysis — consolidation, time rate, FRA and client geometry tolerances | Chapter 6.2 |
| Slope stability — AREMA MRE Ch. 1 embankment design; USACE EM 1110-2-1902 | Chapter 6.3 |
| Ground improvement — PVD spacing, preloading, schedule implications | Chapter 7.2 |
| Report preparation — investigation plan format per client requirements | Chapter 8.4 |
| Lab testing program — test standards, minimum quantities, acceptance criteria | Chapter 5.2 |