↑ Parent Menu⌂ Main Menu
← Chapter 3.9 Geotechnical Investigation Planning and Scope
GHRM
Railway Ground Hazard Risk Management · 3.0 · Risk Management
Sections · click a car to open it

3.9.9 Representative Lab Test Data Table — Soil Classification Parameters

A well-planned geotechnical investigation is the foundation of every successful railroad engineering project.
Authors: Daniel P. Colwell and Mario Ruel
3.9.9 Representative Lab Test Data Table — Soil Classification Parameters
Table 3.9-3: Boring B-1 — Laboratory Summary (English Units)
SampleDepth (ft)USCS SymbolLLPLPIMC (%)γ_t (pcf)q_u (tsf)Notes
SPT-12–4CL48222638113—Jar sample
ST-15–7CH622834441080.42Consolidation test specimen
SPT-310–12CH64293546107—Jar sample
SPT-520–22CL422022291170.78q_u by UUC
SPT-730–32SMNPNPNP14124—Grain size analysis
SPT-835–37SP-SMNPNPNP12127—Grain size analysis

LL = Liquid Limit; PL = Plastic Limit; PI = Plasticity Index; MC = Natural Moisture Content; γ_t = Total Unit Weight; q_u = Unconfined Compressive Strength (UUC); NP = Non-Plastic

Soil Index Properties
Soil Index Properties
← Previous · 3.0 Risk Management Chapter 3.8 — Risk Ratings and Ground Hazard Risk Assessment
Next · 3.0 Risk Management → Chapter 3.10 — Mining and Man-Made Hazards