The correlations used in this chapter are listed below. Each gives an estimate, not a test result. The full equation, variables, range of applicability, constraints and source for each one, and the note to record whenever one is used, are in the Empirical Equations & Correlations reference.
| ID | Correlation | Gives |
|---|---|---|
| IS-01 | SPT energy & procedure correction | N₆₀ |
| RK-10 | UCS from point load index | σ꜀ |
| IS-02 | SPT overburden normalization (sands) | (N₁)₆₀ |
| IX-01 | Compression index from liquid limit (undisturbed) | C꜀ |
| RK-01 | Rock Mass Rating (RMR₈₉) | RMR |