↑ Parent Menu⌂ Main Menu
← Chapter 3.9 Geotechnical Investigation Planning and Scope
GHRM
Railway Ground Hazard Risk Management · 3.0 · Risk Management
Sections · click a car to open it

3.9.8 Representative Boring Log — Sample Format

A well-planned geotechnical investigation is the foundation of every successful railroad engineering project.
Authors: Daniel P. Colwell and Mario Ruel
3.9.8 Representative Boring Log — Sample Format

BORING LOG — PROJECT: [Railroad] [Project Name] [Milepost]

Pile Boring Log
Pile Boring Log

Boring No.: B-1 Date Drilled: [Date] Sheet: 1 of 1

Location: STA 10+50 (MP 347.2 + 0.05 mi), 12 ft Right of CL, Looking Incr. MP

Ground Surface Elevation: 342.4 ft (NAVD 88) Drill Rig: CME-75 Track-Mounted

Drilling Method: Hollow Stem Auger (HSA) 3.25-in. ID Hammer: Auto SPT, 140 lb

Driller: [Name], Certified Class I railroad RWP Logger: [PE Name], PE

DEPTH SAMPLE BLOW DESCRIPTION

(ft) TYPE COUNT (USCS — ASTM D2488/D 2487)

----------------------------------------------------------------------

0-2 - - Fill: silty CLAY, gray-brown, soft, moist

(CL per USCS, AASHTO A-6)

2-5 SPT-1 3/5/7 CLAY, gray-brown, soft to medium, wet

N = 12 (field) MC = 38%

5-10 ST-1 - Shelby Tube (undisturbed sample for consolidation)

CLAY, gray, soft, wet; slight organic odor

MC = 44%, LL = 62, PI = 34 (CH)

10-15 SPT-3 2/4/4 CLAY, gray, soft; N₆₀ = 8; MC = 46%

15-20 SPT-4 4/5/6 CLAY, gray-tan, medium; N₆₀ = 11

20-25 SPT-5 6/8/10 CLAY, tan, medium-stiff; N₆₀ = 18

25-30 SPT-6 8/12/15 Transition to Sandy CLAY (SC); N₆₀ = 27

30-35 SPT-7 11/15/18 SAND, fine, silty, tan (SM); N₆₀ = 33

35-40 SPT-8 15/22/28 SAND, fine-medium, tan-gray (SP-SM); N₆₀ = 50

40 --- --- End of boring at 40 ft (No rock encountered)

Water Level: 6.2 ft below ground surface (measured 24 hr after drilling)

Casing: 3.25-in. HSA, pulled and abandoned

Empirical equation note · this section

Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.

  • IS-01 SPT energy & procedure correction N₆₀Use: All soils tested by SPT (ASTM D1586). Normalizes blow count to 60% of theoretical free-fall energy, the basis for most U.S. correlations. Limits: CE ranges ~0.5–1.6 depending on hammer type; use measured energy (ASTM D4633, withdrawn 2025) where available. Rod-length factor ranges differ between Skempton (1986) and Youd et al. (2001).
← Previous · 3.0 Risk Management Chapter 3.8 — Risk Ratings and Ground Hazard Risk Assessment
Next · 3.0 Risk Management → Chapter 3.10 — Mining and Man-Made Hazards