↑ Parent Menu⌂ Main Menu
← Chapter 2.5 Clays: Properties, Typical Values and Behavior
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.5.17 Cross-References

Clay is the soil whose behavior depends most on water and time: it is strong when dry and weak when wet, it consolidates for years under new fill, it swells and shrinks with the seasons, and in cut slopes it slowly loses strength until it slides.
Author: Daniel P. Colwell
2.5.17 Cross-References
TopicRefer To
Track subgrade failure modes and blanket layersChapter 2.3, Sections 2.3.4–2.3.5
Slope failure mechanismsChapter 3.8, Section 3.8.3
CPTu and field vane testingChapter 5.1, Sections 5.1.2–5.1.3
Classification and Atterberg limitsChapter 2.2, Section 2.2.3
Consolidation settlement and time rateChapter 6.2, Sections 6.2.4–6.2.8
Residual strength and progressive failureChapter 6.3, Section 6.3.6
Wick drains, DSM, lime and cement stabilizationChapter 7.2, Sections 7.2.3–7.2.7
SiltsChapter 2.4
Peats and organic soilsChapter 2.6
Typical values from blow counts and Atterberg limitsAppendix D
← Previous · 2.0 The Underworld Chapter 2.4 — Silts: Properties, Typical Values and Liquefaction
Next · 2.0 The Underworld → Chapter 2.6 — Peats and Organic Soils: Properties, Typical Values and Behavior